6
Movex Innovation Inc.
GETTING STARTED / TWIN-TRACK 47
1.
C
ONNECTING THE
B
ATTERIES
Note: DUE TO SHIPPING REGULATIONS, THE BATTERIES ARE UNPLUGGED
DURING DELIVERY
a) Remove the Control Panel situated on the left side of the Track-O.
VIEW THROUGH OPENING
b) Connect grey plugs as shown above.
Note: Before replacing panel, read next step: Putting Breaker on «ON»
position (next page).