A
35
PART
DESCRIPTION
ID.
QTY.
Philips Pan Head Screw
M05x25
13
3
Fix Wrench
Philips
STEP 18: ASSEMBLY THE CAREN AND FINAL ADJUSTMENTS
Steel cable tensioner
-
20
1
Figure 18-1
A - Point adjustment
A
Hex Nut Low profile
M8
24
1
Philips Flanged Head Tril. Screw (EDGE)
M4X12
26
2
24
20
ASSEMBLY
13
13
Leveled
to the floor
To do the tensioning
of the wire rope, let the pin
loaded selector opening
then the legs of the
equipment.
Summary of Contents for 8505290
Page 2: ......
Page 7: ...INSTRU ES Posicionamento dos adesivos na m quina 7...
Page 8: ...Posicionamento do adesivo chart de instru o 8 INSTRU ES 50 mm 10 mm...
Page 16: ...MONTAGEM 16 PASSO 1 MONTAGEM DO CAME PE A DESCRI O ID QUANT 1 2 3 21 Espa ador 21 1...
Page 39: ......
Page 44: ...7 STICKERS POSITIONS ON THE EQUIPMENT INSTRUCTIONS...
Page 45: ...8 INSTRU ES STICKERS POSITIONS ON THE EQUIPMENT...
Page 54: ...ASSEMBLY 17 STEP 1 CAM ASSEMBLY PART DESCRIPTION ID QUANT 1 2 3 21 Spacer 21 1...
Page 64: ...STEP 10 WEIGHT POSITION To assemble that we suggest 2 people 27 ASSEMBLY...
Page 77: ......
Page 82: ...Posici n de los adhesivos en la m quina 7 INSTRUCCIONES...
Page 83: ...8 Posici n de los adhesivos en la m quina INSTRUCCIONES 50 mm 10 mm...
Page 84: ...9 INSTRUCCIONES...
Page 92: ...MONTAJE 17 PASO 1 MONTAJEM DEL CAME PIECA DESCRICI N ID CANT 1 2 3 21 Espa ador 21 1...