
29
1. Log Splitter Frame . . . . . . . . . . . . . . . . 1 set
2. Control Lever and Guard Assy . . . . . . 2 sets
3. Support Table . . . . . . . . . . . . . . . . . . . . 1 set
4. Wheel . . . . . . . . . . . . . . . . . . . . . . . . . . 2 pcs
5. Wheel Shaft . . . . . . . . . . . . . . . . . . . . . . 2 pcs
6. Owner’s Manual . . . . . . . . . . . . . . . . . . .1 pc
7. Hardware Bag, including . . . . . . . . . . . . 1 set
1. Insert the wheel shaft into the grooves provi-
ded in the base, then secure it with two M6x8
bolts. Put the wheels on the wheel shaft, fol-
lowed by the washers and then secure the
wheels with the cotter pins, finally place the
wheel caps.
CONTENTS OF THE
SHIPPING CONTAINER
SET UP AND PREPARATI-
ON FOR OPERATION