
3
Number
in Kit
Description of Part
Bagged Parts
1
1/16” x 3/4” x 5.75” Ply Battery Stick
1
1/4” Balsa Sheet
1
3/16” Balsa Sheet
1
1/8” x 4.25” Dowel
2
Micro EZ Servo Connector
2
DuBro Micro EZ Link
5 4-40
T-Nut
2
4-40 x 1” Nylon Bolt
2
2” DuBro Wheels
1
3/4” DuBro Tail Wheel
1
#2 Motor Screw
4 Cowling
Screws
2 Magnets
2
#4 Washer (Magnetic)
5
#4 Washer (Non-Magnetic)
2 EZ
Hinges
2
3/32” x 3/4” Aluminum Tube (Wheel Bushings)
2
1/8” x 5/8” Aluminum Tube (Wheel Bushings)
3
4-40 x 3/8” Socket Cap Screw
1
Allen Wrench, 3/32”
2 Wheel
Retainers
1
1/2” Double Sided Velcro
1
3/4” Sticky Backed Velcro (Pile and Loop Sides)
1
Spider Wire, 12 feet
Building Materials You Will Need
•
Smooth and flat work surface
•
Wax paper or clear plastic wrap to protect the work surface
•
Thin and thick Cyanoacrylate (CA) glue
•
5 Minute Epoxy
•
Hobby knife with #11 blades
•
Needle nose pliers
•
Wire bender or pliers for bending landing gear wire
•
Wire cutters
•
Screwdrivers
•
Sanding block, 320 to 400 grit sandpaper
Finishing Materials You Will Need
•
Covering material (So-Lite or similar)
•
Sealing iron for applying the covering
•
Paint for cowling and engine plastics