(C.) Prepare Wheelstop for Tire SIze
Place the front tie down arm in the slot of the platform, making sure the curved section is facing out-
ward. Lay down the two parts of the wheelstop (front stop & back stop) onto the platform, align the
holes to the desired placement, then insert two bolts. Put on the nuts and washers then hand tighten
only for now (this is to ensure alignment of loading ramp in Step 4). Then put short bolt with the lock-
washer through the back stop and tire track into the threaded hole on the platform tube.
(NOTE: Layout is adjustable per your tire’s size, measure your tire and place to size for optimal fit).
m3, Max or Max+ Components (8/21/21)
5