
68
100
min.
81.5
40
173
120
120
(mm)
Pa
g
.
8
- M
a
n
u
a
l c
o
d
e:
1
1
9
R
7
1
7
9
G
B
11
9
R
7
1
7
9
G
B
ve
r.
3
.0
3.
0
0
7
/2
0
0
9 - T
h
e d
a
ta a
n
d i
n
fo
rm
ati
o
n i
n
th
is
m
a
n
u
a
l a
re s
u
b
je
ct t
o
c
h
a
n
g
e
at a
n
y ti
m
e
.
1
- Set up the tubes for the
electrical connection and
junction boxes.
3
- Decide where to fi x the head bracket.
Position the base plate on the post,
making sure the fi xing and
application measurements
are right (see this drawing)
(see page 6).
2
- Insert the electrical
cables that come
from the junction pit into
the tubes, making sure
the sections are right
depending on the use to
be made (see installation
on page 4).
PRELIMINARY OPERATIONS AND BRACKET MOUNTING
Head bracket
Base plate