November, 1999
6880906Z38-O
-15
Telario TS3000 Control Station Installation Manual
Installation Preparation
and Programming
Required Tools
•
Laptop PC with a Pentium processor, 64 megabytes of RAM, an RS232 port
and a CD-ROM.
•
Telario Management Tool Kit, kit number H5183, includes the CD, a Get-
ting Started Manual, and programming cables (kit numbers HKN9023 and
HKN9024)
•
A line tester with a DTMF pad and earpiece, to verify that all telephone
lines are functional, is recommended.
Other Materials You Might
Need at the Site
•
Punchout tool – Motorola part no. 66-80333A39
•
Velcro straps
•
Tie wraps
•
Ladder or lift
•
Telescopic tripod
•
Beam clamps
•
Molly bolts
•
Category 5 crimping tool
•
Category 5 continuity tester
•
Calculator
•
Phone connector kit
•
Power connector kit
•
Wrenches & screwdrivers
Programming
The final step to installation preparation is programming the customer ’s
equipment with the Telario Management Tool (TMT). Refer to the TMT help
windows for assistance.
Control Station
Installation
Mounting
Ideal mounting choices are the bottom of a horizontal I beam, or on the ceiling
with the standard trunnion. The trunnion allows at least 10 degrees of rotation
in one plane. For optimal coverage of the facility, the Control Station should be
installed horizontally.
Remote Mount Antenna
If you must mount the Control Station in a vertical orientation, coverage could
be restricted significantly. For these cases, we suggest using the Motorola
Remote Mount Antenna. The Remote Mount Antenna connects to the rear of
the Control Station, extending the space diversity antenna system up to four
feet, thus allowing for more flexible mounting options, while maintaining sys-
tem integrity.