5 - 6
O p e r a t i o n
SG 20 00 Ins tal la tion and O pera tion M anua l
For upgrading to split return operation, with DS-SG2-DRT-2X/A transmitters installed in positions
A and B, the SG2-RPM/C board must be replaced with an SG2-RPM/S board. The main RF chassis
must be removed to perform this exchange. Figure 5-9 illustrates the inside bottom view of the RF
chassis, the location of the SG2-RPM/C board, and the removal sequence:
F i g u r e 5 - 9
R F c h a s s i s a n d l o c a t i o n o f t h e SG 2 - R PM / C o r S G 2 - R PM / S b o a r d
Cover
SG2-RPM/C
Power connector
RF chassis
1
Remove any fuses at F1, F2, F3, F5, or F6 to prevent arcing of the housing connectors.
2
Remove the six 5/16-inch hex-head screws that secure the RF chassis to the housing. Remove
the housing.
3
Remove the six ¼-inch hex-head screws that secure the rear cover. Remove the cover.
Summary of Contents for Starline SG 2000
Page 105: ...481740 001 12 01 MGBI ...