6880309U09-A
October 26, 2007
Disassembly/Reassembly Procedures
: Chassis Thermal Compound Replacement Procedure
6-47
7. Place the top cover on the chassis and seat it properly. Compress the cover and chassis
together to squeeze the foam into place and make torquing the screws easier.
8. Using a CR-V PH2 torque driver, fasten the 7 binding head screws, M3x6 SUS B to the top
cover following the sequence as shown in
(Torqued to 5.8–6.9 kgf*cm/
5–6 in. lbs).
Figure 6-90. Sequence for Installing Top Cover Screws
6.3
Chassis Thermal Compound Replacement Procedure
Follow the following procedures when replacing the chassis thermal compounds.
Figure 6-91. Chassis Thermal Compound Locations
2
5
1
6
7
3
4
1
1
1
Summary of Contents for PM1200
Page 1: ......
Page 2: ......
Page 6: ...iv Notes ...
Page 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Page 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Page 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Page 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Page 137: ......