5-1
Section 5
TRANSCEIVER PERFORMANCE TESTING
1.0
Introduction
The radios have been prepared to meet published specifications through their manufacturing
process, with the use of laboratory-quality test equipment of highest accuracy. The recommended
field service equipment approaches the accuracy of the manufacturing equipment with a few
exceptions.
Accuracy of the equipment must be maintained in compliance with the manufacturer’s
recommended calibration schedule.
2.0
Setup
Supply voltage can be connected from the battery eliminator. The equipment required for alignment
procedures is connected as shown in the Radio Alignment Test Setup diagram.
Initial equipment control settings should be as indicated in the following table and should hold for all
alignment procedures except as noted in Table 5-1.
Table 5-1 Initial Equipment Control Settings
Service Monitor
Test Set
Power Supply
Monitor Mode: Power Monitor
Spkr set: A
Voltage: 7.5Vdc
RF Attn: -70
Spkr/load:
Speaker
DC on/standby:
Standby
AM, CW, FM: FM
PTT: OFF
Volt Range: 10V
O’scope Source: Mod
O’scope Horiz: 10mSec/Div
O’scope Vert: 2.5kHz/Div
O’scope Trig: Auto
Monitor Image: Hi
Monitor BW: Nar
Monitor Squelch: mid CW
Monitor Vol: 1/4 CW
Current: 2.5A
Summary of Contents for GP88s
Page 1: ...November 2003 GP88s Portable Radio Service Manual 6804111J47 D ...
Page 4: ...iv Document History THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...xvi 4 0 Parts List for Speaker Mic Assembly 0104008J99 10 2 Glossary of Terms G 1 ...
Page 28: ...3 6 Programming Test Cable THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...5 6 Test Mode THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 56: ...6 4 Cloning Information THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 60: ...7 4 Controller Board THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 180: ...9B 48 Circuit Board Schematic Diagrams and Parts List THIS PAGE INTENTIONALLY LEFT BLANK ...