Introduction
3
1.3 Site Preparation
•
Consult your site survey and network analysis to determine specific equipment placement,
power drops etc.
•
Assign installation responsibility to the appropriate personnel.
•
Identify and document where all installed components are located.
•
Ensure adequate, dust-free ventilation to all installed equipment.
•
Prepare Ethernet port connections.
•
Verify cabling is within the maximum 100 meter allowable length.
1.4 Package Contents
The access point ships with the following:
•
One AP-6521 Series access point
•
Installation Guide
(This Guide)
•
Rubber Wall Mount Spacers (4)
•
LED light pipe and badge
•
Wall mount screw and anchor kit
1.5 Features
•
One RJ-45 console connector
•
One RJ-45 Ethernet connector
•
LED Indicators
•
Safety wire tie point
•
Wall mount slots
•
Clips for suspended T-Bar mounting
•
DC power connector
An AP-6521 Series access point has one RJ-45 connector supporting an 10/100/1000 Ethernet port
connection and requires 802.3af compliant power from an external source.
The access point contains runtime firmware which enables the unit to boot after either a power up
or a watchdog reset. The runtime firmware on the access point can be updated via the Ethernet
interface.