background image

Version 1.5

© Openpath 2021

9

To power locking hardware without an external supply (Wet Relay),  select 12V or 24V, 
and connect locking hardware to NO and GND (for fail  secure locks) or NC and GND 
(for fail safe locks). 

Figure 4 Wet Relay example

To use external power, select DRY and use NO or NC and C, and wire to  external 
supply.

Figure 5 Dry Relay example

PROVISIONING THE SDC

Provisioning the SDC means registering it in the Control Center and  getting it up and 
running with the latest firmware. You will need to  re-provision in the case of 

RESETTING 

THE SDC

  

Note:

 If you're provisioning SDCs for a customer account, the  customer org will need 

to be created first.   

REQUIREMENTS

 

l

Meet all 

NETWORK REQUIREMENTS 

 

l

Connect the ACU to the Internet via Ethernet

Summary of Contents for Openpath

Page 1: ...OPENPATH SINGLE DOOR CONTROLLER INSTALLATION GUIDE V1 5...

Page 2: ...OPENPATH READERS 6 WIRING INFORMATION 6 STANDARD WIRING CONFIGURATION 8 WIRING FAIL SAFE AND FAIL SECURE LOCKING HARDWARE 8 PROVISIONING THE SDC 9 REQUIREMENTS 9 CREATE SDC 10 PROVISIONING STEPS 11 TE...

Page 3: ...or floors l Whether you re using legacy wiring or new wiring l What kind of electronic entry mechanisms Request to Exit REX mechanisms and door contact sensors will be used and their power requirement...

Page 4: ...reader ports max power output 250mA 12V each l 2 relays max power output o PoE Max 3W combined output e g 250mA 12V or 125mA 24V o PoE Max 9W combined output e g 750mA 12V or 375mA 24V SELECTING A BA...

Page 5: ...On the right side of the main housing D ensure that the two edge clips fit into their respective notches on the backplate B 5 Press firmly on the main housing D to snap into place 6 Partially unscrew...

Page 6: ...wiring see STANDARD WIRING CONFIGURATION 7 Snap on front cover G WIRING OPENPATH READERS Openpath Readers and SDCs communicate via RS 485 The following wire types are compatible listed in the order o...

Page 7: ...not connect the other side of the shield to anything For standard reader installation We recommend that you install a 1 Gang 20 CU box in order to flush mount the reader Alternatively the reader may...

Page 8: ...D FAIL SECURE LOCKING HARDWARE Fail safe and fail secure are ways of configuring locking hardware l Fail safe hardware unlocks when power is interrupted l Fail secure hardware locks when power is inte...

Page 9: ...use NO or NC and C and wire to external supply Figure 5 Dry Relay example PROVISIONING THE SDC Provisioning the SDC means registering it in the Control Center and getting it up and running with the la...

Page 10: ...er a Site Name and any other relevant site information optional then click Next 4 Enter how many controllers are located at your Site a Enter names for the controllers b From the Controller Type dropd...

Page 11: ...then tap on the org name 3 Wait until the Status LED is solid blue then press the Admin button Figure 6 on the SDC c Note SDC will disconnect from the Open Admin app after 5 minutes of inactivity pres...

Page 12: ...will change to solid white Troubleshooting the SDC If at any point the Status LED blinks red this indicates there is an issue connecting to the Internet If attempting to set up using Wi Fi try switchi...

Page 13: ...n ping https api openpath com health NETWORK SETTINGS In the Open Admin app you can configure network settings for the SDC Ethernet and Wi Fi connections can be DHCP default or can have a static IP ad...

Page 14: ...GS The country code on the SDC is automatically set up during initial connection and provisioning based on information from the installer s Open Admin app This setting cannot be changed by the install...

Page 15: ...Blinking Purple indicates the SDC is ready to connect to the Open Admin app Solid Red indicates the SDC is in an error state refer to Troubleshooting the SDC The Openpath SDC has eight port LEDs and t...

Page 16: ...N button for 15 seconds see Figure 6 3 While still holding down the ADMIN button reconnect the power and continue to hold the button for another 15 seconds until the Status LED turns yellow then relea...

Page 17: ...antenna of Openpath Smart Reader s and persons during operation NOTE This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rul...

Page 18: ...adiated power e i r p is not more than that necessary for successful communication Conform ment la r glementation d Industrie Canada le pr sent metteur radio peut fonctionner avec une antenne d un typ...

Page 19: ...MULL FCC ID 2APJVOPR2LHF Smart Readers OP RLF STD OP RHF STD OP RLF MULB OP RHF MULB OP R2LHF STD OP R2LHF MUL 12VDC 0 25A OP RLF STD MULB FCC ID 2APJVOPRLF OP RHF STD MULB FCC ID 2APJVOPRHF OP R2LHF...

Reviews: