background image

6

 

 

 

200mm

10˚

EN

03. INSTALLATION

INSERT PILLAR INTO THE HOLE

a

) Remove the screws and the pillar cover.

 

b

) After, insert the pillar into the hole on the ground.

Seal

Remove 

seal

APPLY SAND AND CONCRETE

Add sand and then concrete inside the hole to fix the pillar.

FIX THE PILLAR

Remove the material used for the seal and place the cover back on the pillar, fixing with 

the same screws that you removed.

COMPACT 

SAND

CONCRETE

DRAINAGE 

WASTEWATER

CONCRETE

AUTOMATISM INSTALLATION

• At the base of the pillar, place a tube for draining waste water, with a minimum inclination of 10°.

• Provide a tube to pass the electric cable to the control board.

• Place sand around the pillar for better accommodation.

• The concrete must be made with cement and sand, for greater resistance.

• The control board must be installed with a minimum height of 200mm from the ground.

• If the distance between center and pillar is higher than 10 meters, use a cable with Ø2.5mm cross-section.

Apply some cloth paper to seal the inside of the automatismo, preventing dirt or other 

object from entering into the automatism.

3a

3b

4

4

5

3

4

5

Summary of Contents for MPIE10

Page 1: ...v1 0 REV 03 2021 MPIE10 MPIE10 EN INSTALLER AND USER S MANUAL...

Page 2: ...erial controls etc should not be disposed of as other household waste at the end of its useful life To avoid possible harm to the environment or human health resulting from the uncontrolled disposal o...

Page 3: ...persons with experienced in terms of usage of the product in a safe manner and who understands the risks and dangers involved Children shouldn t play with the product or opening devices to avoid the...

Page 4: ...an emergency Ifthesystemrequiresanyrepairormodification unlocktheautomatism turn off the power and do not use it until all safety conditions have been met In the event of tripping of circuits breakers...

Page 5: ...ight 35Kg 40Kg 45Kg Power Supply 24 Vdc Power 150W Nominal power consumption 3A Operating Temperature 20 C 50 C Material of the moving piece 2 5mm Stainless steel Cover Non slip 4mm Stainless steel Ma...

Page 6: ...Dimension c 370mm 570mm 785mm 03 INSTALLATION AUTOMATISM INSTALLATION CREATE FOUNDATION Drill a hole on the ground with the necessary dimension for the placement of the pillar taking into account the...

Page 7: ...E AUTOMATISM INSTALLATION At the base of the pillar place a tube for draining waste water with a minimum inclination of 10 Provide a tube to pass the electric cable to the control board Place sand aro...

Page 8: ...On there is some security systems malfunction photocells safety edges If START circuits LEDs are turn Op and Cl there is a control device sending permanent signal 3 If the pillar work the problem is o...

Reviews: