AGITO
AGITO User Manual OS 5.0 Nova
38 - Setting up
»
TOWER: ATTACHING CAMERA SYSTEM
ALWAYS ENSURE THE PAYLOAD IS PROPERLY AND SECURELY FIXED TO THE
AGITO TOWER, USE A MINIMUM OF FOUR FIXTURE POINTS.
Remove the Quick Release Plate from the Tower
Loosen the 3/8th inch lock and lift out plate
Align the Quick Release Plate with the holes on the Remote Head
Inset and tighten the four bolts,
be careful to use the correct length bolts
Locate the Quick Release Plate back into the top of the Tower
Ensure the Plate is located correctly, tighten the 3/8th Locking Bolt
When using the Power and the optional Fibre Optic pass-through, please refer to “Tower: Power & Fibre pass-through” on page 54.
»
ATTACHING DUAL CAMERA MOUNTS (TRAX)
ALWAYS ENSURE THAT THE MAXIMUM CHASSIS PAYLOAD IS NOT OVERLOADED.
ALWAYS ENSURE THE PAYLOAD IS PROPERLY AND SECURELY FIXED TO THE
AGITO TOWER, USE A MINIMUM OF FOUR FIXTURE POINTS.
TOWER & MITCHELL MOUNT
Using the optional “Shark-fin” mounts, it is possible to position two camera mounts on the Chassis.
2x MITCHELL MOUNT
Using the optional “Shark-fin” mounts, it is possible to position two camera mounts on the Chassis.
»
ATTACHING CHEESE PLATE (SPORTS)
Align the Cheese Plate to the 4 fixing holes on the top of the Sports Drive-end
Insert and tighten the 4 hex counter sunk screws
»
SHARK-FIN MOUNTS
Using the optional “Shark-fin” mounts, it is possible to off-set mounts over the drive-ends.
(Note: this will restrict the mounting of accessories such as PSU)