Startup
23
Manual # 42-02-U001, Rev C1
5. Press the Down Arrow button repeatedly until the Save screen appears.
6. Press the Enter button to save your changes. The Save screen will flash for a few seconds
then go back to the Off screen.
7. On the back of the UPS, locate the On/Off Utility Input Breaker switch. Use the breaker
switch to shut the UPS off. Wait a few seconds, then set the breaker switch back to On.
The UPS will display:
8. Press and hold the ON button on the front of the UPS. After a few seconds the UPS will
begin a self TEST, followed by an OK message, and then display:
9. Re-check the UPS output as described in “Check Setting”,
. Then, proceed to “Set
.
Set Parameters
Verify or set parameters to factory defaults using the keypad and LED display on the controller
board. There are two Function menus, FUN1 and FUN2. Parameters within them are numbered
F1-1 through F1-9 and F2-1 through F2-9 respectively. FUN1 values are adjustable; FUN2 val-
ues are display only.
When the UPS has completing “booting”, the
overbar displayed above LINE-UPS-LOAD will
disappear.
Move between menus
Increments value or
advances to next
parameter
Previous parameter or
moves cursor to the
left
Use to select a parameter or
save a value. When saving a
value, the word YES will be
displayed only if the value
was changed
Summary of Contents for TAPS
Page 6: ...2 Manual 42 02 D001 Rev A 1 September 2003...
Page 15: ...Installation 9 Manual 42 02 U001 Rev C1 Figure 5 6kVA UPS Enclosure Base Assembly...
Page 16: ...10 Manual 42 02 U001 Rev C1 Figure 6 6kVA UPS Enclosure Assembly...
Page 40: ...34 Manual 42 02 U001 Rev C1 6kVA Units The 6kVA unit uses an LCD as well as LEDs...
Page 42: ...36 Manual 42 02 U001 Rev C1 6 12 12...
Page 43: ...TAPS Drawings 37 Manual 42 02 U001 Rev C1...
Page 44: ...38 Manual 42 02 U001 Rev C1...