background image

The Specialist In Drum Handling Equipment

Model 400AM-60

Hydra-Lift, 60”, with Spark Resistant Parts,  

Manual Lift & Tilt

Operator’s Manual for Morse Hydra-Lift Karrier Model 400AM-60

with Serial Number 0414 to ____ (MMYY)

morsedrum.com

Copyright 2019 - Morse Mfg. Co., Inc.  Form OM400AM-60 (0414-____)   

(Updated 12 Jun, 2019 11:34 AM)

 

6

Operating Instructions

Push the Hydra-Lift Karrier to the drum.

1. 

Using the “LIFT” control as described in “Machine Description 

2. 

- Controls” (page 3) , position the drum holder assembly with 

the back band at the middle of the drum. (Figure 3.1).  With 

the ratchet plate swung open and the cinch chain hanging 

from the chain hook, push the unit until the back band rests 

firmly against the drum.  Some adjustment to the tilt angle of 

the saddle may be necessary to ensure band fits flush on the 

drum.

Attaching the drum: Drape the chain across the front of the 

3. 

drum and engage a link into the slot in the ratchet (Figure 

3.2).  Turn the ratchet clockwise to tighten chain.  If ratchet 

turns until the pawl is beyond the last ratchet tooth, turn the 

ratchet back and slide the next link into the ratchet slot and try 

tightening again.  The chain must be held tightly against the 

drum with the pawl engaged securely in the ratchet teeth.

Operate the lift function to lift drum clear of floor.  Roll to 

4. 

dispensing location.  NOTE: Do not allow the drum to impact 

on floor, pouring station, etc. or a spill or damage could occur. 

 

 

5. 

 

 

 

 

CAUTION

 

– Do Not Transport with Drum Raised 

 

 

 

ALWAYS LOWER THE DRUM HOLDER TO LOWEST POSITION BEFORE TRANSPORTING. 

 

 

 

The unit can become unstable when transporting with a raised load. 

Lift drum to desired pouring height.  Operate the tilt control as described in 

6. 

“Machine Description - Controls”

 (page 3) to adjust the 

drum attitude. This is especially important when lifting an open drum.  The floor lock should be engaged while dispensing / draining.

When dispensing is complete, tilt drum back to upright position.  Disengage the floor lock and lower the drum to transporting height; 

7. 

about 6” off the floor.

 

 

 

 

 

WARNING

 - Stay Clear of Raised Drum

 

 

 

NEVER allow anyone to be below any part of a raised drum handler or drum.  Remain behind the 

 

 

 

push handle while handling a drum. 

 

 

 

WARNING

 – Do NOT Disengage the Cinch Chain When Drum is off the Ground

 

 

 

When the drum is in the upright position, lower the drum to the floor before releasing the cinch chain.

 

Push the unit to the drum storage area and lower to the floor in an upright position.  Release the cinch chain from the ratchet by 

8. 

applying pressure to the ratchet handle in a clockwise direction with one hand and opening the pawl to free the ratchet with the other 

hand.  Remove the cinch chain link from the ratchet.

Maintenance

Periodic inspection for the general condition of structural and mechanical components is imperative for safe and efficient operation.

• 

Periodically inspect all moving parts, framework, and contact areas for signs of wear, fatigue, or loosening.  Tighten, adjust, or 

• 

replace parts as necessary to prevent failure and maintain proper function.

Inspect the hydraulic system for oil drips, hose damage, or other signs of wear.  Inspect the level and condition of the hydraulic fluid.  

• 

Replace any parts that show signs of wear.

Grease wheel bearings periodically. Oil or grease all moving parts including: the three clevis pins and the surfaces of the boom which 

• 

contact the inside of the mast cap, the hinge pin, the gears and sprockets in the tilt drive, and the ratchet and pawl.

Worn or damaged parts must be properly replaced with the correct, genuine Morse parts.

• 

Hydraulic pump should be filled with the provided quart of Mobil ATF D/M (Morse part # 3983-P). Material safety data sheet (MSDS) 

• 

is available online. Change oil yearly, sooner depending on dirty conditions or outdoor use.

Figure 3.2

Summary of Contents for 400AM-60

Page 1: ...tal camera at your receiving dock for this purpose Open packages expeditiously to check the condition of the goods There is only a 24 hour window to notify the carrier of any concealed damage IMMEDIATELY REPORT ALL DAMAGE TO THE SHIPPING COMPANY Then you may contact Morse for assistance with your freight claim Morse Manufacturing will not be held responsible for any damaged freight that is not sig...

Page 2: ...y For operation only on clean level floors of suitable bearing capacity Do not use on sloped surfaces ramps irregular or debris strewn floors WARNING Do Not Modify the Unit Under no circumstances should any modifications be made to the Morse machinery without factory au thorization Any modifications may void the warranty This machine was designed to perform a specific job and alterations may resul...

Page 3: ...cket Assembly or the Top Rim Clamp Part 4560M P see figure 2 2 You can use the Top Rim Clamp to handle a 55 gallon plastic steel or fiber drum with suitable top rim Controls The Morse Hydra Lift Karrier is manually propelled and steered There are two functions for the operator to control Figure 2 3 LIFT and lower function for vertical positioning of the drum 1 TILT function to control the degree o...

Page 4: ...ng action before depending on it to hold MORcinch Drum Holder Assembly The drum holder assembly or saddle assembly is the compo nent on the Hydra Lift Karrier that is intended to hold the drum The MORcinch drum holder assembly is designed to secure a standard ribbed 55 gallon steel drum around it s middle using a cinch chain and ratchet tightening system The MORcinch drum holder accepts accessorie...

Page 5: ...Figure 2 Step 3 Tip the tower up so it stands on the casters and wheels Step 4 Lift overhead assembly into position A drift pin can help align the holes Insert a greased clevis pin item 12 through mast cap and boom Tighten collar set screw onto pin See figure 3 Step 5 Next connect the cylinder item 16 to the overhead assembly Align ram eye with holes in boom clevis plates and insert a greased clev...

Page 6: ...hen lifting an open drum The floor lock should be engaged while dispensing draining When dispensing is complete tilt drum back to upright position Disengage the floor lock and lower the drum to transporting height 7 about 6 off the floor WARNING Stay Clear of Raised Drum NEVER allow anyone to be below any part of a raised drum handler or drum Remain behind the push handle while handling a drum WAR...

Reviews: