Venting
Installation
1. When installing the vent pipe, be sure all connections are fastened correctly to insure no
leaks and proper draft is achieved. Minimum draft through the unit is, -.02- with draft
meter. Draft up the stack must be -.04 to -.06 inches of water column when checking a
draft meter for proper draft readings.
2. If proper or desired draft isn’t easily achieved, a third party draft inducer or power vent
may be needed to prevent back draft from occurring (not provided).
3. Install a barometric damper (NOT included) in the stack only if the draft up the stack
exceeds -.08. Draft up the stack must be -.04 to -.06 inches of water column. Check with
draft meter between the top of the boiler and damper. The draft should be a minimum of
-.02- checked through flame inspection port.
4. Keep the draft moving. If draft is too slow or bottles up, this could create a back draft and
over-fire or over heat the unit. If a damper is present, losing the damper will increase draft
make sure passageways are clean and clear.