background image

 

LED 

COLOR 

STATUS 

STATUS DESCRIPTION 

Power 

Green 

On 

Power On 

Off 

Power off 

LINK/ACT 

(1~24) 

Green 

On 

A device is connected to the port 

Off 

A device is disconnected to the port 

Flashing 

Sending or receiving data 

 

25,26T 

 

LINK/ACT 

Green 

On 

A device is connected to the port 

Off 

A device is disconnected to the port 

Flashing 

Sending or receiving data 

27,28S 

LINK/ACT 

Green 

On 

A device is connected to the port 

Off 

A device is disconnected to the port 

Flashing 

Sending or receiving data 

POE 

Orange 

On 

A Powered Device is connected to the port, 

which supply power successfully 

Off 

No Powered Device connected to the port, or 

no power is supplied according to the power 

limits of the port. 

Flashing 

The POE power circuit may be in short or the 

power current may be overloaded. 

2.2 Rear Panel 

The rear panel of the Switch contains AC power connector and one marker shown as 
below.   

 

Figure 3 - Rear Panel 

AC  Power  Connecto

r:  Power  is  supplied  through  an  external  AC  power  adapter.  It 

supports AC 100~240V, 50~60Hz. 

 

 

 

Summary of Contents for SW-UNM-24FE2GC-24POE

Page 1: ...SW UNM 24FE2GC 24POE 24 Port 10 100Mbps 2 Port Gigabit Combo POE Unmanaged Ethernet Switch User Manual Ver 1 1...

Page 2: ...a in one single cable allowing you to expand your network where there are no power lines or outlets where you wish to fix devices such as AP IP Cameras or IP Phones etc The Switch is easy to install a...

Page 3: ...0 1000Mbps RJ 45 ports 25T 26T Designed to connect to the device with a bandwidth of 10Mbps 100Mbps or 1000Mbps Each has a corresponding 10 100 1000Mbps LED SFP ports 27S 28S Designed to install the S...

Page 4: ...he port Off A device is disconnected to the port Flashing Sending or receiving data POE Orange On A Powered Device is connected to the port which supply power successfully Off No Powered Device connec...

Page 5: ...pation from and adequate ventilation around the Switch Make sure the cabinet to enough back up the weight of the Switch and its accessories 3 1 1 Desktop Installation Sometimes users are not equipped...

Page 6: ...r cord and check the power indicator is ON or not When it is ON it indicates the power connection is OK 3 2 Connect Computer NIC to the Switch Please insert the NIC into the computer after installing...

Page 7: ...x 10 100Mbps Auto Negotiation ports 2GE 2SFP LED indicators Link Act Link Act POE POE Power Power 25 26T 27 28S Link Act Transfer Method Store and Forward Switching Capacity 12 8G MAC Address Learning...

Page 8: ...7 www morrelltelecom com sales morrelltelecom com morrelltelecom...

Reviews: