
50
Operation
Schedule
Maintenance Items
2 weeks after installation
Re-tighten power terminal connections to specified torque
values.
3 months after installation
Re-tighten power terminal connections to specified torque
values.
Monthly or After Each
Equalization
Inspect the battery bank. Look for cracked or
bulging cases, and corroded terminals.
F
RUZHWFHOOÀRRGHGW\SHEDWWHULHVPDNHVXUHWKHZDWHUOHYHO
is correct. Wet cell water levels should be checked monthly or
according to the manufacturer’s
recommendations.
Annually
Clean the heatsink fins with a clean, dry rag.
Inspect all wiring for damage or fraying.
Inspect for nesting insects.
Re-tighten all wiring terminal connections to specified torque
values.
Inspect the system earth grounding for all components. Verify all
grounding conductors are appropriately secured to earth ground.
Table 4-6. Maintenance Schedule