4.0 USP Installation   

4.1 Preparation 

 MORKO will evaluate the application and give instructions with respect to the location and 

placement of the USP transducers(See the figure4).     

 To maximize the USP effect, the USP installation should take place after the equipment has 

been cleaned. For heat transfer performance USP has been shown to be more effective when 
the system starts from a clean condition. 

  The  welding  process  must  be  done  while  the  equipment  is  off-line  to  remove  the  risks 
associated  with  high  process  fluid  pressure  and  to  eliminate  flammable  gases  or  liquids 
inside the process equipment barriers.   

 

4.2 Transducer Welding Installation 

 The welding should be done by a qualified expert journeyman welder under the supervision 
of a welding inspector. 

 The welding should be done while the system is off-line and any process fluids should be 
removed  from  the  system,  and  any  pressure  or  flammable  gases  inside  the  vessel  or 
process piping should be removed. 

 After cleaning and preparing the welding surface by sandpaper or grinder, the expert welder 

shall use the GTAW (Argon) procedure. Welding Inspection is recommended. 

      The welding must be done as same as the diameter of the wave guide rod. The weld bead 

diameter  must  not  exceed  5mm  greater  than  wave  guide  rod  diameter  and  the  inside  of 
welding  part  must  not  contain  any  slag  or  gas  bubbles  to  ensure  there  is  minimal   
ultrasonic power losses in the weld. 
(See the figures 4 and 5 below) 
 
 

 

 
 

Figure 4: Example Weld Instruction Drawing

 

Summary of Contents for USP-300-AT

Page 1: ...MANUAL USP 300 AT Dual SCR Option and Dual Power Issue date 12 Dec 2014 Revision 0 Comply to UL KTL standard Http www morko com...

Page 2: ...USP INSTALLATION 6 5 0 GENERATOR ELECTRICAL DIAGRAM USP 300 AT AND GENERATOR AND TRANSDUCER MODULES 9 6 0 GENERATOR PARTS LIST 11 7 0 TRANSDUCER MODULE ASSEMBLY DIAGRAM 13 8 0 WIRING CONNECTION DIAGR...

Page 3: ...ion action prevents scale from settling on the metal surface and the existing scale breaks off and continues to flow downstream This allows for increased heat transfer efficiency better overall heat t...

Page 4: ...made of SS304 and cover of aluminium alloy Al 6061 T6 The enclosure is provided with threaded enclosure and cover and moulded o ring of Viton provided between enclosure and cover for Ingress protecti...

Page 5: ...Copyright Morko International all Rights Reserved 5 3 0 Dimensions of Generator and Transducer Figure 2 USP Generator Enclosure Figure 3 USP Transducer...

Page 6: ...ransducer Welding Installation The welding should be done by a qualified expert journeyman welder under the supervision of a welding inspector The welding should be done while the system is off line a...

Page 7: ...rs The generator housing serves to protect the generators from direct sunlight The generator should be mounted vertically on a frame or wall Figure 6 Typical installation Generators with housing shelt...

Page 8: ...ish Installation and Test Operation The final electrical termination and commissioning will be done by Morko engineers or certified distributors The USP system must be tuned to operate at the optimal...

Page 9: ...Copyright Morko International All Rights Reserved 9 5 0 Generator Electrical Diagram USP 300 AT and Generator and Transducer Modules Figure 9 USP Generator Electrical Diagram for USP 300 AT...

Page 10: ...Morko International All Rights Reserved 10 Generator Module Transducer Module Figure 10 Generator Module Component Configuration Figure 11 Transducer Module Terminal Configuration A B C 3pin Terminal...

Page 11: ...C1 Elec Capacitor module 105 inc DC Filter 330uF x 3 1 To be replaced every 2 years F Fuse holder 6A 1 Spare fuse located inside generator box C2 C3 Switching Capacitor 1uF 2 To be replaced every 2 ye...

Page 12: ...Teflon wire PFA high Temp Electric wire To be replaced every 4 years MO TD 003 Terminal PCB module Electronic component Inspect every 2 years MO TD 004 SUS Enclosure body Stainless steel No replaceme...

Page 13: ...Copyright Morko International All Rights Reserved 13 7 0 Transducer Module Assembly Diagram...

Page 14: ...or the transducer cable A 31 Red A C 32 33 Black C B 35 Blue B The main earth connection should be done on generator side outside of enclosure using cable size 6 sqmm The ground wire of transducer cab...

Page 15: ...Conduit and Armored Cable Diagram Generator Flameproof Flexible coupling 1 2 Flameproof Union Coupling 1 2 Transducer Flameproof Sealing Fitting 1 2 Flameproof Sealing Fitting 1 2 Flameproof Flexible...

Page 16: ...Copyright Morko International All Rights Reserved 16 10 0 System Configuration 220V 50Hz 3 4NPT 2 x 1 2 NPT 4 x 1 5SQmm Amor shielded cable Figure 12 USP System Configuration...

Page 17: ...incorporated into operation walk about schedule Ensure main power is in ON position at all time during operation Check Generator s pilot lamps LD1 LD2 to ensure lights are blinking This indicates that...

Page 18: ...eck the insulation between each terminals No A 31 B 32 33 C 35 and Ground case with Mega ohm tester Insulation tester 4 The insulation is OK over 200Mohm then check the C2 C3 capacitors with visual ch...

Reviews: