FKS PrintBind KB 2000S
Zu 4 : Dust Bag
Zu
4.:
Dust Bag
Whilst permanent
use of the machine the dust
‐
bag must
be controlled
and emptied regularly.
Please check
min.
weekly!
Zu
2.:
Compressor for air pressure
The
air compressor is integrated and mounted complete inside the stand
cabinet factorywise.
Detailed instructions please see instruction manual
for model
KB
2000
Zu
3.:
Slitting device
The
tooles in
the slitting device produce a
wider
and deeper slitting of
the spine for better penetration of glue.
Details
for set
‐
up of depth for
slitting please see instruction manual for KB
2000
Zu
5.:
Glue Assembly – Glue Drums
The
surface of the 2
glue
‐
drums is scroed for more efficient and equal
glue supply to the spine.
Zu
7.:
Cooling Rack
In
the by
‐
pack
‐
kit the cooling rack is supplied.
This can be mounted left
‐
hand side on
the stand
cabinet.
The
screws are fixed already in
theaded
holes in
stand
cabinet
Zu
8.:
Key
‐
Lock
‐
Switch
For service
‐
personal
only:
Key
‐
Lock
‐
switch for test
‐
runs without
closed safety hood.
Switch
‐
Keys are enclosed and remain with
authorized,
regional
supplier
Summary of Contents for KB2000
Page 30: ...9 Technical Specifications ...
Page 31: ... ...
Page 32: ... ...
Page 34: ...10 Installation of Stand Cabinet Version to be assembled only ...