Start Up
15
B : Operator Check list
It is the owner / drill operators’ responsibility to set up the drill for:
1. Sowing depth according to conditions in each soil type and pre worked condition
2. Tramline bout number to suit tramlines
3. Tramline
track
width
4. Number of rows shut off whilst tram lining
5. Marker width setting to allow matching of bouts
6. Operation of half width shut off
It is also the owner / operator’s responsibility to check the operation of the various
functions of the machine between each hopper fill, or at least once every hour to check the
machine is operating correctly.
Summary of Contents for 240G
Page 9: ...Safety Instruction Decals Safety Stickers 9 ...
Page 10: ...Safety Instruction Decals 10 ...
Page 11: ...Safety Instruction Decals 11 25 ...
Page 12: ......
Page 22: ...Settings A Distribution Settings Size metres 2 40 3 00 Turns 62 5 50 22 ...
Page 37: ...Flow Rate Tables Calibration Procedure 37 ...
Page 38: ...Flow Rate Tables Calibration Procedure 38 ...
Page 39: ...Flow Rate Tables Calibration Procedure 39 ...
Page 40: ...Flow Rate Tables Calibration Procedure 40 ...
Page 43: ...Grassland Parts booklet 2007 grassland seeding line ...
Page 45: ...Grassland Main Chassis ...