6 Transportation and Storage
Unpacking/checking a delivery
© Moog GmbH User Manual "D633-A Series" (CA80942-001; Version 1.0, 12/08) 34
6.1 Unpacking/checking a delivery
Unpacking/checking
a delivery
Procedure:
1.
Check whether the packaging is damaged.
2.
Remove the packaging.
3.
Store the damaged packaging so that if necessary damages can be
claimed from the transport contractor.
We recommend that you also keep the undamaged original packaging for
later transportation or storage operations.
4.
Dispose of the packaging material no longer needed in accordance with
the relevant national waste disposal regulations and environmental pro-
tection provisions.
5.
Check whether the packaging contents is damaged.
6.
In the event of damaged packaging or damaged contents, immediately
notify us or the responsible supplier.
7.
Check whether the delivery corresponds to the order and the delivery
note.
8.
In the event of wrong or incomplete delivery, immediately notify us or the
responsible supplier.
6.2 Scope of delivery of the valve
Scope of delivery
of the valve
The scope of delivery of the valve consists of:
• Valve with mounted oilproof shipping plate at the hydraulic port
• 4 O-rings ID 9.25 x Ø 1.8 [mm] (ID 0.364 x Ø 0.071 [in])
for ports A, B, P and T
• 1 O-ring ID 7.65 x Ø 1.8 [mm] (ID 0.301 x Ø 0.071 [in])
for port Y
6.3 Storage
Effects of long-term
storage
The following effects may occur in the course of long-term storage:
• Sealing materials become brittle, possibly resulting in leaks
• Hydraulic fluid becomes gummy, possibly resulting in friction
In order to avoid possible resulting impairments or damage, we recommend
that the valve, after a period of storage or operation of more than 5 years, be
inspected by us or one of our authorized service centers.
CAUTION
After transporting or storing valves, spare parts and accesso-
ries, check the original packaging and contents for possible
damage.
Do not start up the system if the packaging or contents show
signs of damage. In this case, immediately notify us or the re-
sponsible supplier.
In the event of transportation damage, store the damaged
packaging so that if necessary damages can be claimed from
the transport contractor.