background image

P/N XG0207

Page 24

M40DV-ST See-Thru Gas Fireplace

 

                   

                       

 

Amendment

 

 

 

  (Gas Fireplace / Equipment sold in the State of Massachusetts)

 

 

 

 

   5.08: Modifications to NFPA-54, Chapter 10

 

(1) Revise NFPA-54 section 10.5.4.2

 

by adding a second exception as follows:

Existing chimneys shall be permitted to have their use continued when a gas conversion burner is installed, and shall be equipped with a manually reset device 

that will automatically shut off the gas to the burner in the event of a sustained back-draft

.

 

(2) Revise 10.8.3

 by 

adding the following additional requirements:

(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, 

including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in 

the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied: 

 

1. INSTALLATION OF CARBON MONOXIDE DETECTORS.

 

At the time of installation of the side wall horizontal vented gas fueled equip

-

ment, the installing plumber or gas fitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor 

level where the gas equipment is to be installed. In addition, the installing plumber or gas fitter shall observe that a battery operated or hard wired carbon 

monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled 

equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon 

monoxide detectors

a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with 

alarm and battery back-up may be installed on the next adjacent floor level.

b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days 

to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm 

shall be installed.

 

2. APPROVED CARBON MONOXIDE DETECTORS.

 

Each carbon monoxide detector as required in accordance with the above provisions 

shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified. 

 

3. SIGNAGE.

 

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet 

above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print 

size no less than one-half (1/2) inch in size, “GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

 

4. INSPECTION.

 The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, 

upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4. 

(b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4: 

 

1. The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the 

Board; and 

 

2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or struc

-

ture used in whole or in part for residential purposes.  

 

(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED

. When the manufacturer of Product 

Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions 

provided by the manufacturer for installation of the equipment and the venting system shall include:

 

1. Detailed instructions for the installation of the venting system design or the venting system components; and

 

2. A complete parts list for the venting system design or venting system. 

 

(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED

. When the manufacturer of a Prod

-

uct Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, 

the following requirements shall be satisfied by the manufacturer:

 

1. The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and 

 

2. The “special venting systems”

 shall be Product Approved by the Board, and the instructions for that system shall include a parts list and 

detailed installation instructions. 

(e) A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for 

venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

 

(3) After NFPA-54 section 10.10.4.2

 add a new section 10.10.4.3 as follows:

When more than four gas appliances are to be vented through a common gas vent or common horizontal vent manifold, a plan of the proposed vent installation 

shall be submitted to the Inspector and the serving gas supplier for review and approval.

Extraction from: Massachusets Rules and Regulations

5.00: Amendments To 2002 Edition Of ANSI Z223.1-NFPA-54

Appendix C - State of Massachusetts

Summary of Contents for M40DV-ST

Page 1: ... this manual with the appliance Consumer Leave this man ual for future reference Check local codes and read all instructions prior to installation C US WARNING Improper installation adjustment alteration service or maintenance can cause injury or property damage Refer to this manual For assistanceoradditionalinformation consultaqualifiedinstaller service agency or the gas supplier Safety Notice Gl...

Page 2: ...NGER Indicates a hazardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a hazardous situation which if not avoided could result in minor or moderate injury NOTICE Used to address practices not related to personal injury Important Used to address practices ...

Page 3: ...bility for the following actions Modification of the fireplace and or components including Direct Vent assembly or glass doors Use of any component part not manufactured or approved by Montigo in combination with this Montigo fireplace system Installation other than as instructed in this manual Consult your local Gas Inspection Branch on installation require ments for factory built gas fireplaces ...

Page 4: ...wn in Figure 20b For protection against freezing temperatures it is recommended that outer walls of the chase be insulated with a vapour barrier This will Figure 2a Framing dimensions for the rough opening Clearances The M40DV ST clearances to combustible materials are Top 8 Ends 1 Floor Combustible Mantle 6 Flue Cover 1 1 2 Clearance from the top of the fireplace to a combustible ceiling within t...

Page 5: ... piping system during any pressure testing of that system at test pressures in excess of 1 2 psig 3 5 kPa The appliance must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 5 kPa Installation Vent Installation This section covers the installati...

Page 6: ...rews 12 12 MSR Figure 4b Installing a PT0 3 termination with the MSR frame Figure 4c Installing a PT0 3 termination with the MOSR frame 12 12 12 MOSR Installing Terminations with MOSR Frames 1 Frame the termination opening to 12 x 12 2 Fasten the MSR frame to the interior side of the studs using a minimum of 4 screws 3 Insert the termination into the MSR frame as shown here and attach by screwing ...

Page 7: ...ple B Acceptable Installation If the vertical dimension from the hearth is 72 and the horizontal run to the wall flange of the vent termination is 36 this would be an acceptable installation Example C Unacceptable Installation If the vertical dimension from the floor of the fireplace is 48 and the horizontal run to the wall flange of the vent termination is 108 this would not be an acceptable inst...

Page 8: ...rizontal installation Figure9 Extendedhorizontalinstallationusingacombinationofrigid and flex venting Figure8 HeatShieldforshorthorizontalinstallation Installbysliding overtheventpipewhereitconnectstothetermination Heat Shields Due to high flue temperatures the heat shield RHS101 must be used on all installations straight through the wall at the point where the vent pipe connects to the terminatio...

Page 9: ...e of at least 2 2 Offset Vertical Installations Amaximumoftwooffsets eachoffsethastwo90 bends maybe made if the length of the offsets does not exceed 25 of the vertical vent height when measured center to center of piping Example Typical vent installation 30 vertical vent 2 2 offsets required 25 of 30 7 1 2 max offset allowed This venting configuration meets requirements Figure11b Verticalventingw...

Page 10: ... flange of the vent termination is 120 this would be an acceptable installation Example B Acceptable Installation If the vertical dimension from the hearth is 66 and the horizontal run to the wall flange of the vent termination is 30 this would be an acceptable installation Example C Unacceptable Installation If the vertical dimension from the floor of the fireplace is 48 and the horizontal run to...

Page 11: ...ve foot chase allow for a maxi mum horizontal run of twelve and one half feet from the centre of the fireplace to outside wall and a minimum of 7 6 when retracted in opposite direction See Figure 14a and 14b D flex sections and E solid sections may be used in conjunction with one another to obtain different possible horizontal length instal lations NOTE Flex section must not exceed maximum horizon...

Page 12: ... made if the length of the offsets does not exceed 25 of the vertical vent height when measured center to center of piping Example Typical vent installation 30 vertical vent 2 2 offsets required 25 of 30 7 1 2 max offset allowed This venting configuration meets requirements A Termination PVTK 1 B Flex sections PFL 1 12 section PFL 2 24 section PFL 3 36 section PFL 4 48 section C Solid sections PEX...

Page 13: ...peratures over the mantel will rise above normal room temperature and walls above fireplace may be hot to touch We recommend careful consideration be given to the effects of elevated mantel temperatures which may be in excess of product design for example candles plastic or pictures This can cause melt ing deformation discoloration or premature failure of T V and radio components Painting Figure 2...

Page 14: ...eywellgascontrol and pilot M40DV ST I Removing the Doors To remove the inner doors simply unscrew the eight 8 machine screws on the top and bottom of the door See figure 22c Door Installation To re install the doors align the door with the screw holes and re fasten with all eight machine screws Ensure that a good seal is maintained Re install the side panels and louvre assemblies by reversing the ...

Page 15: ...plied with five 5 fibre logs The two large bottom logs logs A and B are mounted on the burner grate by placing them into the slots Top Logs Place logs C and D into their mating positions on the large logs as shown in Figure 23a below Log E is mounted on top of logs C and D as shown in Figure 23b Warning If logs are not placed properly excessive sooting will result Installing the Ember Material The...

Page 16: ... Operation Model M40DV ST 3 Push in gas control knob slightly and turn clock wise to Off Do not force 4 Flip up the lower end louvres 1 Turn off remote switch 2 Flip down the lower end louvres 1 STOP Read the safety information above on this label 2 Flip down the lower louvres on the end panel of the fireplace 3 Push in gas control knob and turn clockwise to OFF 4 Wait five 5 minutes to clear out ...

Page 17: ...floor because some gas is heavier than air and will settle on the floor What To Do If You Smell Gas Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions 1 Turn off remote switch 2 Flip down the lower end louvres Gas Inlet Gas Control Switch Shown ...

Page 18: ...u Smell Gas Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions 1 Turn off remote switch 2 Flip down the lower trims 3 Turn the incoming gas control valve to Off 4 Flip UP the lower trims 1 STOP Read the safety information above on this label 2 F...

Page 19: ... page 13 Handle the door carefully and clean it with an approved glass cleaner One of the most effective products is Kel Kem Silicone seals on inner door during initial firing will off gas leav ing a visual deposit of on combustion chamber walls This can easily be removed by following the steps described below Use a vacuum cleaner or soft bristle brush to keep the control compartment burner and fi...

Page 20: ...ol valve Flame is decreased by turning adjustment screw clockwise Pilot won t ignite Disconnect remote wires and try to light pilot If pilot now works remote connections are faulty Check wiring diagram figure 17 Main burner will 1 Check wiring see figure 17 not light 2 Check wall switch for proper con nection 3 Check pilot burner If extinguished a Allow fireplace to cool then try to relight b If c...

Page 21: ...rious safety hazards may result in the denial of certification by recognized national safety agencies and could be in violation of local building codes This warranty does not cover any damages occurring from the use of any components not manufactured or supplied by The Companies 2 The Montigo Gas Appliance must be subjected to normal use The Gas Appliances are designed to burn gas only Burning con...

Page 22: ... in the United States 6 feet 1 8 m minimum in Canada L clearance to nonmechanical air supply inlet to building or the combus tion air inlet to any other appliance 16 inches 41 cm minimum for appliances 100 000 BTU H 30kW M clearance to mechanical air supply inlet 6 feet 1 8 m minimum N clearance above paved sidewalk or a paved driveway located on public property 7 feet 2 1 m minimum P clearance un...

Page 23: ...anufactured or mobile home The standard M40DV ST or the M40DV ST I equipped with Hot Surface Ignition HSI are not approved for use in mobile or manufactured homes The M40DV ST MH is rated for Natural Gas at 30 000 BTU H 8 79 Kilowatts max input and 24 000 BTU H 7 03 Kilowatts min input Propane at 30 000 BTU H 8 79 Kilowatts max input and 24 000 BTU H 7 03 Kilowatts min input Conversion Kits The M4...

Page 24: ...y in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon inspection...

Page 25: ...Page 25 P N XG0207 M40DV ST See Thru Gas Fireplace Notes ...

Page 26: ...Canadian Heating Products Inc Langley BC V4W 4A1 Montigo Del Ray Corp Ferndale WA 98248 XG0208 02408 ...

Reviews: