background image

© 2011 Monte Carlo Fan Company

5/10/2012

4

Make wire connections to power source using wire
nuts provided.  Make sure that no filiments are out-
side of the wirenut. After making the wire connec-
tions, the wires should be spread apart with the
grounded conductor and the equipment-grounding
conductor on one side of the outlet box and
ungrounded conductor on the other side of the outlet
box.  

11

Attach blade brackets to blades

using the blade bracket screws

and washers provided.

13

The screws, washers, and motor

pads are pre-installed to the blade

holders. Attach blade assembly to

motor and tighten screws securely.

14

For pullchain controls, follow diagram above.

Make sure that all exposed wiring is secured

inside wire nuts. Note: Wires from house may

vary in color and may not include ground wire.

After wiring is conplete, gently push wires into

junction box with wire nuts pointing upward. 

10

House

Fan

Black

White

Green

Black

White

Green(downrod)

Green(Bracket)

Blue

Loosen one and remove one pre-

assembled screw from mounting

bracket. Save screw. Lift canopy up,

aligning its keyhole slot with the pre-

assembled screw on mounting

bracket and twist clockwise to lock in

place. Re-install the removed screw

and tighten all screws securely. 

12

Summary of Contents for 5WF42 Series

Page 1: ... to this card and retain as your proof of purchase DATE OF PURCHASE MODEL NUMBER RETAILER NAME RETAILER ADDRESS To register your fixture please visit our website www montecarlofans com 5WF42XX Series Fan Total fan weight UL Model No AC 542OD 5 69kgs 12 52 lbs ...

Page 2: ...cal Codes and Regulations If Installing The Secondary Support Safety Cable in the U S Do Not Re move Knockouts In The Outlet Box Mount the secondary support safety cable through the reserved nail screw hole on the outlet box to the building structure or the ceiling joist WARNING To reduce the risk of personal injury do not bend blade holders during installation to motor balancing or during cleanin...

Page 3: ...y and yoke covers into yoke Align hole in downrod and yoke push pin through and replace keeper Tighten set screws and locking nuts see inset Install downrod to canopy and then install yoke cover to downrod Thread wires and safety cable through downrod 3 2 1 5 6 4 Hang assembled fan from the mounting bracket installed to ceiling in previous steps Make sure the fan is hanging straight Rotate fan unt...

Page 4: ...e pre installed to the blade holders Attach blade assembly to motor and tighten screws securely 14 For pullchain controls follow diagram above Make sure that all exposed wiring is secured inside wire nuts Note Wires from house may vary in color and may not include ground wire After wiring is conplete gently push wires into junction box with wire nuts pointing upward 10 House Fan Black White Green ...

Page 5: ...e levels are unequal Check this level by selecting a point on the ceiling above the tip of one of the blades Measure this distance from blade tip to ceilng Keeping measure within 1 8 rotate the fan until the next blade is positioned for measurement Repeat for each blade If all blade levels are not equal you can adjust blade levels by the following procedure To adjust a blade tip down insert a wash...

Page 6: ...Jul 2013 Update for CUL regulation ...

Reviews: