Page | 11
35HP
–
Op Manual Rev 0 3/28/12
All specifications are subject to change without notice.
Step 7: (
A) Secure Wiring Harness to Draw Bar w/ (3) 16” Tie Wraps
(B)
Connect Battery (2) 5/16” x 1” Carriage Bolts and (2) 5/16” nuts
Battery installation (acid not included)
Safety Note: EYE PROTECTION and GLOVES are REQUIRED.
Battery Acid Activation should be added in a ventilated area.
Service Engine
–
See engine manufacture’s manual.
Assembly Instructions, cont.
Solutions