background image

Installation Preparation

6

– The framing should be spaced 8-5/8" on the sides and 7-5/8" at
the front from centerline to centerline to accept mounting
screws in the vent support frame.

Note: The cross framing must be spaced 8-3/4" on the side from
centerline to centerline in order to accept the hood mounting
screws.

INSTALL CEILING
SUPPORT STRUCTURE

• At the hood location, install 2 x 4 cross framing

between ceiling joists as shown.

• The 2 x 4 cross framing can be installed standing or

flat.  See illustration.

Typical Support Frame Mounting

8-3/4"
Cross 

Framing

Top View of Support Framing

*7-5/8"

16"

Joist

• The cross framing must be level in all directions.

Check with a spirit level and adjust if necessary.

MPORTANT:  

The ceiling structure must be capable of supporting

the weight of the hood (approximately 100 pounds) and any
inadvertent user contact loads. It is recommended that the hood
support frame be supported by a minimum of 2 x 4  cross framing.

Finish the Ceiling

Once the ceiling is finished mark the location of the
ceiling joist and cross framing.
• Check to be sure that ceiling is level, use shims if
necessary.

• Arrange cross framing  in the ceiling to suit the

existing structure. See examples.

– Secure each 2 x 4 block with at least four (4), #10

wood screws, 3” long (minimum size screws, not
supplied). Use 8 wood screws total for the two
supports.

• The cross framing must be accurately aligned to

assure correct positioning of the hood.

1  MOUNT TEMPLATE

• Align the template with the marks on the ceiling

and tape in place.

– Be sure the template is oriented correctly, with the

front of the hood.

• Use a plumb to check to be sure the mounting

holes will provide parallel alignment with the
countertop below.

• Center punch all hole

locations.

• Drill pilot holes in the 4 screw

locations. Use a 5/32” bit and
drill approximately 1-1/2”
deep.

• Cut  wire access hole

approximately 1" dia.

Wire Access Hole

Front of Hood

Ceiling

Cross

Framing

Support

Frame

Side

View

8-3/4"

Front of

Hood

Support 

Frame

Opening

Upper Half 

Of Support

Frame

Ceiling 

Joist

Cross Framing

Height

Adjustment

Slot

Front

of 

Hood

7-5/8"

8-3/4"

Summary of Contents for ZXR8510

Page 1: ...good things to life If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions Monogram ZXR858 ZXR859 and ZXR8510 Recirculating Accessories For Model ZV850 Island Vent Hood ...

Page 2: ...oduct Dimensions 3 Power Supply 4 Tools and Materials Required 4 Remove Packaging Check Contents 5 Install Ceiling Support 6 Installation Instructions Step 1 Mount Template 6 Step 2 Install Upper Support Frame 7 2 BEFORE YOU BEGIN Read these instructions completely and carefully IMPORTANT Save these instructions for local inspector s use IMPORTANT Observe all governing codes and ordinances Note to...

Page 3: ...d charcoal filters PRODUCT DIMENSIONS The vent hood must be installed 24 min and 30 max above the cooking surface 25 1 2 is recommended for best performance and to insure that the duct cover meets the ceiling The cooking surface should be at least 36 above the floor Installation will be easier if the vent hood is installed before the cooktop and countertop is installed 26 1 4 for 8 ft Ceiling Usin...

Page 4: ... metal permanent wiring system or an equipment grounding terminal or lead on the hood WARNING The improper connection of the equipment grounding conductor can result in a risk of electric shock Check with a qualified electri cian or service representative if you are in doubt whether the appliance is properly grounded TOOLS AND MATERIALS REQUIRED NOT SUPPLIED Tape measure Knife Spirit level Wire cu...

Page 5: ...at Washers 4 10mm Nuts and Lock Washers 8 Frame Attachment Screws with Washers attached to accessory support frames 2 Phillips Head Decorative Screws 2 side bars with 4 Machine screws 4 Hex head wood lag screws 6mm x 2 1 2 or 1 4 x 2 1 2 Template Check service manual envelope taped to the front on the hood to be sure it contains one stop screw Leave this screw in the envelope Check contents of the...

Page 6: ...ng Finish the Ceiling Once the ceiling is finished mark the location of the ceiling joist and cross framing Check to be sure that ceiling is level use shims if necessary Arrange cross framing in the ceiling to suit the existing structure See examples Secure each 2 x 4 block with at least four 4 10 wood screws 3 long minimum size screws not supplied Use 8 wood screws total for the two supports The ...

Page 7: ...upper support frame to the ceiling joists and or cross framing with the 4 screws provided For maximum rigidity and strength the screws must be driven into the center of the joists and or cross framing Check to be sure the support frame is level vertically and horizontally Important Again check to be sure the support is level in both directions There is no way to level the hood after the hood is se...

Page 8: ...he required length 4 SECURE WIRING Route house wiring through the ceiling hole and pull a length to reach the hood junction box approximately 6 below the support Note The top and bottom of the duct are external female connections The bottom end should be flared slightly to facilitate installation of the hood Install duct up through support frames onto the top duct connector Push duct up until it i...

Page 9: ...cate the stop screw in the envelope taped to the front of the hood Set aside Slide the lower decorative duct over the installed upper duct and push up past the stop screw location Install the supplied temporary stop screw in one of 3 holes in the support frame or the top duct cover to prevent the bottom decorative duct cover from sliding down CAUTION The stop screw must be installed Failure to do ...

Page 10: ...n Duct Connector to House Duct Stop Screw Install 4 lock washer and 4 Nuts Bottom Duct Cover 8 CONNECT ELECTRICAL Verify that power is turned off at the source WARNING If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be sure to use UL approved anti oxidant compound and aluminum to copper connectors Install strain relief onto ...

Page 11: ...e filter into the lower slots at the rear of the opening Lift the filter and pull the knob forward until the filter rests on the slots Install all 3 grease filters To remove the filters grasp the knob push the filter towards the rear and tilt downwards Grasp tabs on charcoal filters push towards the rear and tilt downwards 11 FINALIZE INSTALLATION Remove the protective film covering the control pa...

Page 12: ...mer information service at 800 626 2000 any time day or night For MonogramTM local service in your area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Monogram General Electric Company Louisville KY 40225 Pub No 49 80045 1 Dwg No 164D4290P014 N D 728 12 00 Printed in It...

Reviews: