background image

Installation Preparation

5

REMOVE THE PACKAGING

The vent hood is packed separate from the required
accessory:  ZXR858, ZXR859 or ZXR8510.
• Remove the frame, cover, parts box, side bars and

packaging.

• Remove junction box cover.
• Install strain relief onto junction box cover.

Check Installation Hardware

Locate the hardware accessory box packed with the
hood and check contents.

Mounting Screw Holes

Front of Hood

4 Flat Washers

4 (10mm) Nuts

and Lock Washers

8 Frame Attachment

Screws with Washers

(attached to

accessory

support frames)

2 Phillips Head

Decorative Screws

2 side bars with 4 Machine screws

4 Hex head

wood lag screws

(6mm x 2-1/2”

or

1/4 x 2-1/2")

Template

Check service manual
envelope taped to the front
on the hood to be sure it
contains one stop screw.
Leave this screw in the
envelope.

Check contents of the required accessory,
ZXR858, ZXR859 or ZXR8510.

Decorative Duct Covers

Support Frames
With 8 Screws
And 8 Washers

3 Stainless Steel

Grease Filters

3 Charcoal Filters

Air
Deflector

Plastic Upper
Duct Connector

Summary of Contents for ZXR8510

Page 1: ...good things to life If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions Monogram ZXR858 ZXR859 and ZXR8510 Recirculating Accessories For Model ZV850 Island Vent Hood ...

Page 2: ...oduct Dimensions 3 Power Supply 4 Tools and Materials Required 4 Remove Packaging Check Contents 5 Install Ceiling Support 6 Installation Instructions Step 1 Mount Template 6 Step 2 Install Upper Support Frame 7 2 BEFORE YOU BEGIN Read these instructions completely and carefully IMPORTANT Save these instructions for local inspector s use IMPORTANT Observe all governing codes and ordinances Note to...

Page 3: ...d charcoal filters PRODUCT DIMENSIONS The vent hood must be installed 24 min and 30 max above the cooking surface 25 1 2 is recommended for best performance and to insure that the duct cover meets the ceiling The cooking surface should be at least 36 above the floor Installation will be easier if the vent hood is installed before the cooktop and countertop is installed 26 1 4 for 8 ft Ceiling Usin...

Page 4: ... metal permanent wiring system or an equipment grounding terminal or lead on the hood WARNING The improper connection of the equipment grounding conductor can result in a risk of electric shock Check with a qualified electri cian or service representative if you are in doubt whether the appliance is properly grounded TOOLS AND MATERIALS REQUIRED NOT SUPPLIED Tape measure Knife Spirit level Wire cu...

Page 5: ...at Washers 4 10mm Nuts and Lock Washers 8 Frame Attachment Screws with Washers attached to accessory support frames 2 Phillips Head Decorative Screws 2 side bars with 4 Machine screws 4 Hex head wood lag screws 6mm x 2 1 2 or 1 4 x 2 1 2 Template Check service manual envelope taped to the front on the hood to be sure it contains one stop screw Leave this screw in the envelope Check contents of the...

Page 6: ...ng Finish the Ceiling Once the ceiling is finished mark the location of the ceiling joist and cross framing Check to be sure that ceiling is level use shims if necessary Arrange cross framing in the ceiling to suit the existing structure See examples Secure each 2 x 4 block with at least four 4 10 wood screws 3 long minimum size screws not supplied Use 8 wood screws total for the two supports The ...

Page 7: ...upper support frame to the ceiling joists and or cross framing with the 4 screws provided For maximum rigidity and strength the screws must be driven into the center of the joists and or cross framing Check to be sure the support frame is level vertically and horizontally Important Again check to be sure the support is level in both directions There is no way to level the hood after the hood is se...

Page 8: ...he required length 4 SECURE WIRING Route house wiring through the ceiling hole and pull a length to reach the hood junction box approximately 6 below the support Note The top and bottom of the duct are external female connections The bottom end should be flared slightly to facilitate installation of the hood Install duct up through support frames onto the top duct connector Push duct up until it i...

Page 9: ...cate the stop screw in the envelope taped to the front of the hood Set aside Slide the lower decorative duct over the installed upper duct and push up past the stop screw location Install the supplied temporary stop screw in one of 3 holes in the support frame or the top duct cover to prevent the bottom decorative duct cover from sliding down CAUTION The stop screw must be installed Failure to do ...

Page 10: ...n Duct Connector to House Duct Stop Screw Install 4 lock washer and 4 Nuts Bottom Duct Cover 8 CONNECT ELECTRICAL Verify that power is turned off at the source WARNING If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be sure to use UL approved anti oxidant compound and aluminum to copper connectors Install strain relief onto ...

Page 11: ...e filter into the lower slots at the rear of the opening Lift the filter and pull the knob forward until the filter rests on the slots Install all 3 grease filters To remove the filters grasp the knob push the filter towards the rear and tilt downwards Grasp tabs on charcoal filters push towards the rear and tilt downwards 11 FINALIZE INSTALLATION Remove the protective film covering the control pa...

Page 12: ...mer information service at 800 626 2000 any time day or night For MonogramTM local service in your area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Monogram General Electric Company Louisville KY 40225 Pub No 49 80045 1 Dwg No 164D4290P014 N D 728 12 00 Printed in It...

Reviews: