13
Installation Instructions
INSTALLATION – VENTED TO THE OUTSIDE
SECURE WIRING
•
Route house wiring through the ceiling hole and
pull a length to reach the hood junction box.
•
Tape the wire to the front of the frame support to
prevent damage during installation and service.
4
658Dia19
Ceiling
Support
Frames
Tape
House
Wiring
Front Side
SIZE AND INSTALL DUCTWORK
•
Measure from house duct (Dim. A) to bottom of
support frame.
– Add at least 1
″
for duct overlap at the top.
– Subtract 3/4
″
for hood insertion into the bottom
of the frame.
•
Cut the 6
″
dia. duct to the required length.
NOTE:
The bottom end of the duct must be flared
slightly, to facilitate installation of the hood.
•
Install duct up through support frames onto the
house duct. Push duct up until it is 3/4
″
from the
bottom of the support frame flange.
•
Secure the duct to house duct connection with
screws and seal with duct tape.
•
Seal duct connection with duct tape, making sure
connection is secured in place.
5
″
Summary of Contents for ZV850
Page 42: ...Notes 42 ...
Page 63: ...63 Notas ...