56D3048
43
HDV Series Direct Vent Gas Fireplace
BRICK, RoCK Wool & loG INStAllAtIoN
FlooR BRICK INStAllAtIoN
Install floor brick before installing logs or rock wool.
1. Remove floor brick from packaging.
. Put left and right brick pieces together as shown in
Figure 58.
3. Match two () firebox tabs with two () slots on bottom
of brick.
Figure 58
4. Push brick down until it makes contact with bottom of
firebox.
Note:
Remove floor brick to install brick walls. Remove
floor brick for cleaning.
FP2486
install floor brick
Figure 58 -
Installing Floor Brick
Firebox Tabs
Slots
Floor
Brick
FP486
INStAll loGS AND RoCK Wool
(eMBeR MAteRIAl) IN FIReBox
1. Carefully remove logs from wrapping.
. Remove glass frame.
Refer to Glass Frame
Removal, Page 42.
3.
Break rock wool into dime-sized pieces. Cover
rear burner completely with rock wool. On front
burner, only cover the ports. Do not exceed 1/"
depth of coverage.
Figure 59
LG686
HDV rock wool
Rock Wool Covering
Entire Back Burner
Rock Wool Covering
Only the Ports in the
Front Burner
LG686
Figure 59 -
Place Rock Wool