background image

 

EC/ECM NO: 

108434

 

SAP  NO : 

187000366

 

Doc No:

AS-18700-101

 Doc part: 

AS

 

REV-

A1

 

MPN/FMT-042 (2016/07/01 REV-00).                                                                                                                                                                                                                                             SHEET No. 

3

 of 

4

                                                    

 

 
 

 
 

 

 
Armored Cable Grounding 

Armored Fiber optic cable metal sheaths may be terminated on the integral pem studs 
(One on each side at the point of entry). A brass grounding nut is included in the 
accessory kit. For proper grounding practices refer to ANSI/J-STD-607-A grounding 
Standard. 
 

Cable slack and routing (Fig. 5) 

  Adequate slack must be included inside the enclosure for sliding drawer to pull out. 

  Full extension of the drawer is 1 feet. 

  Molex recommends a minimum of 1 meter of slack be stored inside the enclosure for tight 

buffered loose tube cables. 

 

Provide minimum 5” to 6” of slack b/w the cable entry point and the point where the cable 

begins to spool around the slack management spools or Velcro straps. 

  Do not install slack management spools when using Mod link MTP assemblies. 

 

Mark cable jacket 18” back from MTP connector with a marker. 

  Secure cable with Velcro or wire ties at the point of entry 

  Route the slack inside the enclosure around the spool. 

  Group cables by side and secure them using the Velcro strap. 

  Velcro strap should be kept loose to allow flexing with opening and closing of drawer. 

 

   

 

 

 

 

 

 

 

            Fig.5 

 

 
 
 
 
 

 

 
 
 
 

CAUTION:

 Molex recommends wearing safety glasses When cutting fiber optic cable. 

WARNING:

 

1.

 

Never look into the connector of MTP assembly or terminated fiber. Laser light may be present and is 
invisible. Serious eye damage is possible. 

2.

 

In the entire cases test the drawer after the fiber is secured to verify the drawer can open and close 
without restriction. 

Summary of Contents for RFR-00082

Page 1: ...EP THIS GUIDE FOR FUTURE REFERENCE RFR 00082 1U 24 PORT CONFIGURABLE FIBER SLIDING DRAWER DIRECTION BELOW APPLY SPECIFICALLY TO THE ENCLOSURE Installing adjustable mounting angles Fig 1 The mounting brackets can be installed in one of two positions which effects Depth of the enclosure is installed in the rack or cabinet Use M4 Philips pan head screws to attach mounting brackets to the enclosure Fi...

Page 2: ...ls Fig 3 Spools are secured using kep nuts Note Do not install slack management Spools for Mod link MTP cable and Modular Splice Cassette installations Fig 3 Back Cable Entry Retention Fig 4 Cables can enter in either the left or right back side of the enclosure Secure cables with Velcro strips or cable ties to the strain relief tie off feature Fig 4 OPEN CLOSE ...

Page 3: ...6 of slack b w the cable entry point and the point where the cable begins to spool around the slack management spools or Velcro straps Do not install slack management spools when using Mod link MTP assemblies Mark cable jacket 18 back from MTP connector with a marker Secure cable with Velcro or wire ties at the point of entry Route the slack inside the enclosure around the spool Group cables by si...

Page 4: ...hey will go no further o Installing Mod Link Cassettes Up to four Mod link cassettes may be installed in the enclosure Mod link cassettes utilize corner retention push pins which when pulled upon open two corner fasteners Position the Mod link cassettes in the appropriate location within the enclosure and push the two corner fasteners gently back until they will go no further Splice Cassette insta...

Reviews: