![Mohawk RJ-15 Installation, Operation, Maintenance, Parts Download Page 14](http://html.mh-extra.com/html/mohawk/rj-15/rj-15_installation-operation-maintenance-parts_1823423014.webp)
MOHAWK MODEL RJ-15 & RJ-25
8
MAINTENANCE PROCEDURES
-- TRAINED LIFT SERVICE PERSONNEL ONLY –
REFER TO ANSI/ALI ALIS, SAFETY REQUIREMENTS FOR INSTALLATION AND SERVICE OF AUTOMOTIVE LIFTS.
DAILY
PERFORM THE PRE-OPERATION CHECK LIST.
REPORT ANY AND ALL EQUIPMENT MALFUNCTIONS
IMMEDIATELY.
CLEAN ALL MOVING PARTS. (IT IS NOT RECOMMENDED TO
GREASE THE INSIDE OF THE CHANNEL ON THE POST,
SWING ARMS OR SWING ARM RESTRAINTS.) IF
OXIDIZATION IS OCCURRING USE A LIGHT LUBRICANT. (WD
- 40 OR EQUIVALENT)
KEEP AREA AROUND THIS EQUIPMENT FREE OF DIRT,
SAND, WATER, ETC.
WEEKLY
PERFORM THE DAILY OPERATION CHECK LIST.
WIPE CLEAN, THE CYLINDERS' WIPER SEALS AND THE
INSIDE OF EACH CYLINDER COMPARTMENT TO REMOVE
ACCUMULATED DEBRIS.
VERIFY FLUID LEVEL. WITH THE UNIT FULLY LOWERED,
THE FLUID LEVEL WILL BE 1/2 INCH BELOW THE BREATHER
CAP PORT. USE DEXRON III AS REPLACEMENT FLUID.
MONTHLY
INSPECT LIFTING COMPONENTS FOR DEFORMATION, WEAR
OR CORROSION.
INSPECT ALL HYDRAULIC COMPONENTS FOR LEAKS,
DEFORMATION, WEAR OR CORROSION.
TIGHTEN ALL FASTENERS AND HYDRAULIC FITTINGS AS
REQUIRED.
1.
ALL O - RING BOSS FITTINGS JAM NUTS ARE TO BE
TIGHTENED TO 15-FOOT POUNDS TORQUE.
2.
ALL PIPE FITTINGS, IF LEAKING IS TO BE REMOVED,
RE-SEALED, AND RE - INSTALLED. (SELECT - UNITE
THREAD SEALANT OR EQUIVALENT ON
FITTING
THREADS)
SEMI- ANNUAL
QUALIFY / RE-QUALIFY ALL PERSONNEL IN THE SAFE
OPERATION OF THIS UNIT.
ANNUALLY
REPLACE AND RE-BLEED THE HYDRAULIC FLUID. ALWAYS
USE A CLEAN FUNNEL AND FILTER. USE DEXRON III
HYDRAULIC FLUID.
INSPECT ALL BEARINGS FOR UNUSUAL OR EXCESSIVE
WEAR. (REPLACE IF NEEDED)
PERFORM THE DAILY, WEEKLY, AND MONTHLY
MAINTENANCE PROCEDURES.
PART REPLACEMENT NOTES
REPLACE ALL WORN OR BROKEN PARTS WITH GENUINE
LIFT MANUFACTURER SUPPLIED PARTS (FROM MOHAWK
RESOURCES LTD. ONLY)
ALL REPLACEMENTS OF PARTS ARE TO BE PERFORMED BY
TRAINED LIFT SERVICE PERSONNEL ONLY.
UPON PART REPLACEMENT, LIFT MUST PASS A FULL LIFT
INSPECTION AS DEEMED SUITABLE BY TRAINED LIFT
SERVICE PERSONNEL.
Summary of Contents for RJ-15
Page 18: ...MOHAWK MODEL RJ 15 RJ 25 12 ...
Page 19: ...MOHAWK MODEL RJ 15 RJ 25 13 ...
Page 20: ...MOHAWK MODEL RJ 15 RJ 25 14 ...
Page 21: ...MOHAWK MODEL RJ 15 RJ 25 15 ...
Page 22: ...MOHAWK MODEL RJ 15 RJ 25 16 ...
Page 23: ...MOHAWK MODEL RJ 15 RJ 25 17 ...
Page 24: ...MOHAWK MODEL RJ 15 RJ 25 18 ...
Page 25: ...MOHAWK MODEL RJ 15 RJ 25 19 ...
Page 26: ...MOHAWK MODEL RJ 15 RJ 25 20 ...
Page 27: ...MOHAWK MODEL RJ 15 RJ 25 21 ...
Page 28: ...MOHAWK MODEL RJ 15 RJ 25 22 ...
Page 29: ...MOHAWK MODEL RJ 15 RJ 25 23 ...
Page 30: ...MOHAWK MODEL RJ 15 RJ 25 24 ...
Page 31: ...MOHAWK MODEL RJ 15 RJ 25 25 ...