MOHAWK MODEL TR-25A, FL-25, TR-19
53
New Slab Recommendations:
The information contained in this appendage supercedes any other information given in the accompanied manual. This
information is presented for design recommendations for a new concrete slab in the event that the pre-existing floor does not meet
minimum requirements of the applicable lift type. Please read all instructions below carefully before producing new slab.
Basic Concrete Requirements:
Minimum Tensile Strength of Concrete:
4,000 P.S.I.
Minimum Aging of New Concrete Slab:
28 days (cure time)
Minimum Thickness of Concrete Slab:
See New Slab Table & Figure Attached
Minimum Width and Length of Slab:
See New Slab Table & Figure Attached
All properties of the new concrete slab are mandatory and must conform to the above stated properties before installation of
the lift is deemed acceptable. The new slab must be totally surrounded by an existing concrete floor. Certified strength documentation
should be obtained from the firm who supplies the concrete mixture at the time of the pour.
The slab above is designed as “stand alone” and does not take into account the contribution of strength from surrounding
concrete. It may be desirable to reinforce the new slab to the pre-existing surrounding floor. Care should be taken to locate these
specific reinforcement bars away from any anchor positions of the specific lift.
This new slab design does not account for second floor installations or installations in a ground floor with a basement beneath.
For this case, the lift should not be installed without written authorization from the building architect.
All
¾
inch diameter anchors must be a minimum of 6 inches away from any expansion seams, control joints or other
inconsistencies in the concrete. All 1 inch diameter anchors must be a minimum of 7
½
inches away from any expansion seams, control
joints or other inconsistencies in the concrete. Refer to anchor manufacturer specifications for specific information concerning edge
distances and bolt to bolt distance requirements.
NEVER, NEVER, hand mix your own concrete.
Rev: 4/2011
File: New-Slab.doc
Summary of Contents for FL-25
Page 21: ...MOHAWK MODEL TR 25A FL 25 TR 19 21 Figure 1 ...
Page 22: ...MOHAWK MODEL TR 25A FL 25 TR 19 22 Figure 2 ...
Page 23: ...MOHAWK MODEL TR 25A FL 25 TR 19 23 Figure 3 ...
Page 24: ...MOHAWK MODEL TR 25A FL 25 TR 19 24 Figure 4 ...
Page 25: ...MOHAWK MODEL TR 25A FL 25 TR 19 25 Figure 5 ...
Page 26: ...MOHAWK MODEL TR 25A FL 25 TR 19 26 Figure 6 ...
Page 27: ...MOHAWK MODEL TR 25A FL 25 TR 19 27 Figure 7 ...
Page 28: ...MOHAWK MODEL TR 25A FL 25 TR 19 28 Figure 8 ...
Page 29: ...MOHAWK MODEL TR 25A FL 25 TR 19 29 Figure 9A ...
Page 30: ...MOHAWK MODEL TR 25A FL 25 TR 19 30 Figure 9B ...
Page 31: ...MOHAWK MODEL TR 25A FL 25 TR 19 31 Figure 9C ...
Page 32: ...MOHAWK MODEL TR 25A FL 25 TR 19 32 Figure 10 ...
Page 33: ...MOHAWK MODEL TR 25A FL 25 TR 19 33 Figure 11 ...
Page 34: ...MOHAWK MODEL TR 25A FL 25 TR 19 34 Figure 12 ...
Page 35: ...MOHAWK MODEL TR 25A FL 25 TR 19 35 Figure 13A ...
Page 36: ...MOHAWK MODEL TR 25A FL 25 TR 19 36 Figure 13B ...
Page 37: ...MOHAWK MODEL TR 25A FL 25 TR 19 37 Figure 14 ...
Page 39: ...MOHAWK MODEL TR 25A FL 25 TR 19 39 ...
Page 40: ...MOHAWK MODEL TR 25A FL 25 TR 19 40 ...
Page 41: ...MOHAWK MODEL TR 25A FL 25 TR 19 41 ...
Page 42: ...MOHAWK MODEL TR 25A FL 25 TR 19 42 ...
Page 43: ...MOHAWK MODEL TR 25A FL 25 TR 19 43 ...
Page 44: ...MOHAWK MODEL TR 25A FL 25 TR 19 44 ...
Page 45: ...MOHAWK MODEL TR 25A FL 25 TR 19 45 ...
Page 46: ...MOHAWK MODEL TR 25A FL 25 TR 19 46 ...
Page 47: ...MOHAWK MODEL TR 25A FL 25 TR 19 47 ...
Page 48: ...MOHAWK MODEL TR 25A FL 25 TR 19 48 ...
Page 49: ...MOHAWK MODEL TR 25A FL 25 TR 19 49 ...
Page 50: ...MOHAWK MODEL TR 25A FL 25 TR 19 50 ...
Page 51: ...MOHAWK MODEL TR 25A FL 25 TR 19 51 ...
Page 55: ...MOHAWK MODEL TR 25A FL 25 TR 19 55 ...