6
INS10903A
Installation Steps
Install the Flange Assembly
安装步骤
1. 安装法兰组件
Note: The processor has been assembled before leaving the factory, so please carefully observe the installation steps
of each component and fixing device before installation, please install as follows.
注意:处理器已在出厂前组装好,因此请您在安装前仔细观察各部件及固定装置的安装步骤。 同时,请按下述方法安装。
1
2
用起子将法兰组件上的螺丝
(G)
拆松,再用起子插入连接环
(K)
,顺时针作用力,将处理器从法兰组件上拆下。
用起子将法兰组件的卡箍
(I)
拆下,将其他零件 从法兰组件上
按图示顺序拆开。
C
或
Use a screwdriver to loosen the screw
(G)
on the flange
assembly, then insert the screwdriver into the connecting
ring
(K)
, and apply force clockwise to remove the proces-
sor from the flange assembly.
Use a screwdriver to remove the clamp
(I)
of the flange assem-
bly, and remove the other parts from the flange assembly in the
order shown in the figure.
K
I
I
4
3
G
E
F
G
H
C
3x
将法兰
(C)
下槽口穿过法兰橡胶平垫
(D)
,再将法兰
(C)
穿过水
槽孔装入(法兰橡胶平垫
(D)
处于法兰
(C)
与水槽间,起密封防
水作用)。
Pass the lower slot of the flange
(C)
through the flange rubber
flat gasket
(D)
, and insert the flange
(C)
through the groove hole
(the flange rubber gasket
(D)
is in the flange
(C)
and the groove
, play a role of sealing and waterproofing).
在水槽下面,按顺序腊圈
(E)
,支撑环
(F)
,装配环
(H)
装入穿
过水槽的法兰
(C)
上,用螺丝
(G)
固定。注意:此时螺丝
(G)
不
需要装紧。
Under the water tank, install the wax ring
(E)
, support ring
(F)
,
and assembling ring
(H)
onto the flange
(C)
bottom. Fasten with
screws
(G)
. Note: The screws
(G)
do not need to be tightened at
this time.
D
C
G
F
K
Summary of Contents for MEX50MCL
Page 13: ...13 B A 30 A B...