Module-Air
Revised 03-01-2018
Page 1: ...housing These units are about 750 pounds and cannot be handled or transported without the help of lifting tools It is recommended that you consult a professional electrician prior to installing this...
Page 2: ...elow Take the unit down and place it on a level surface that allows access to the back panel of the Main Housing To access the motor pulleys and belt Remove the door panel by removing 16 20x1 1 4 bolt...
Page 3: ...d other materials NFPA also has standards that cover other dusts like grain and plastics ect For guidelines on determining which precautions should be taken please refer to NFPA 497 There may be other...
Page 4: ...lure or inadequate supports Installation Diagram on PG 5 Installation methods will depend upon the style of intake options that were selected when your system was ordered The following is a basic guid...
Page 5: ...Module Air Revised 03 01 2018...
Page 6: ...Module Air Revised 03 01 2018 480 V Three Phase 60Hz Three phase motor L1 L2 L3 OL OL OL T1 T2 T3 3 phase power...
Page 7: ...Module Air Revised 03 01 2018...
Page 8: ...ective in material or workmanship can be shipped prepaid to MODULE AIR or authorized service facility in which case a determination will be made whether to repair or replace the component MODULE AIR i...