CONNECTING THE HOOK LEVER & FOOT PEDAL
ASSEMBLIES:
1.
REMOVE THE PRE-INSTALLED CLEVIS PIN,
WASHER, COTTERPIN, HEX BOLT, AND NUT
FROM THE LINKAGE ASSEMBLY & FOOT PEDAL
ASSEMBLY AS SHOWN IN THE DIAGRAM TO
THE LEFT
STEP 9*
INSERT THE
5
16
" BOLT & THROUGH THE FOOT PEDAL
AND LONG LINK HOLES SECURE WITH WASHER AND NUT
STEP 11*
THIS BOLT ADJUSTS THE STARTING POSITION OF
THE JAWS WHEN PLACING A MITCHELL WREATH
RING INTO THE MACHINE IT CAN BE ADJUSTED FOR
THE SMALL, REGULAR & LARGE STYLE CLAMP RINGS
* PLEASE NOTE SOME FRAMING MEMBERS NOT SHOWN FOR VISUAL CLARITY
** MULTIPLE HOLES HAVE BEEN INSERTED INTO THE LINKAGE ASSEMBLYL. THESE ARE TO RAISE OR LOWER
THE FOOT PEDAL TO A COMFORTABLE LEVEL
*** THE MULTIPLE HOLES ARE THERE TO ALLOW ADJUSTMENT OF THE HEIGHT OF THE FOOT PEDAL WITH THE
JAWS IN THEIR FURTHEST OPEN POSITION. THIS IS A PERSONAL PREFERENCE ADJUSTMENT DEPENDING ON
THE COMFORT OF THE OPERATOR
REV: 05
TIGHTEN THE NUT TO SECURE ADJUSTMENT BOLT IN PLACE
PAGE 6 OF 10
INSTALL THE LONG LINK:
1.
INSERT THE LONG LINK BETWEEN THE BARS OF THE
HOOK LEVER ASSEMBLY
2.
INSERT CLEVIS PIN THROUGH HOOK LEVER ASSEMBLY
AND LONG LINK AND SECURE WITH COTTER KEY
STEP 10***
LOOSEN THIS BOLT UNTIL THE JAWS REST AGAINST THE
UNFOLDED CLAMP RING OF YOUR STYLE
Summary of Contents for NO-HAMMER
Page 1: ......