the flange and record the number of turns. To increase the
load, screw the flange away from the u-bracket (i.e. compressing
the spring). It should be possible to rotate the spring by hand if
nut A is, at the same time, rotated in the same direction by a
24mm ring wrench. One end of the spring assembly may be
lifted out of the spring support to get a better grip. Otherwise a
strap wrench may be used.
3.1.2.4 With the spring in position, release nut A, but do not remove it
yet.
3.1.2.5 Repeat the above operations for the other spring, using the same
number of turns.
3.1.2.6 Measure the wheel load as described in 3.1.1 above.
3.1.2.7 If the load is still not correct, use the measured load increment
and number of turns (see 3.1.2.3) to calculate the required
number of turns to arrive at the correct value and repeat the
above steps until the wheel load is correctly set. Also measure
the length of both springs. They should not differ by more than
2 mm.
3.1.2.8 REMOVE THE NUTS AND SPACERS ON BOTH SPRINGS.
3.1.2.9 Adjust the tyre pressure if necessary.
3.2
Setting up the machine on the pavement
To prevent damage to the machine, it is important that the pavement be
fairly flat and firm enough to carry the weight of the machine. Keep in
mind that the wheels travel at high speed and that bumps or holes in the
pavement may cause large shock loads.
3.2.1
Getting the machine into position
3.2.1.1 Move the machine in position on the test pavement by its
transport wheels or by crane.
Summary of Contents for MMLS3
Page 7: ...MLS Test Systems Pty Ltd Revised April 2013 5...
Page 12: ...MLS Test Systems Pty Ltd Revised April 2013 10...
Page 13: ...MLS Test Systems Pty Ltd Revised April 2013 11...
Page 16: ...MLS Test Systems Pty Ltd Revised April 2013 14...
Page 19: ...MLS Test Systems Pty Ltd Revised April 2013 17...
Page 24: ...MLS Test Systems Pty Ltd Revised April 2013 22...
Page 26: ...MLS Test Systems Pty Ltd Revised April 2013 24...
Page 42: ...MLS Test Systems Pty Ltd Revised April 2013 40 APPENDIX D Circuit diagrams...
Page 43: ...MLS Test Systems Pty Ltd Revised April 2013 41...
Page 44: ...MLS Test Systems Pty Ltd Revised April 2013 42...
Page 45: ...MLS Test Systems Pty Ltd Revised April 2013 43...
Page 46: ...MLS Test Systems Pty Ltd Revised April 2013 44...
Page 48: ...MLS Test Systems Pty Ltd Revised April 2013 46...