•
Please see DIP switch layout to set up the sensor
•
Replace the diffuser ensuring seal is in place
•
Switch on and check for correct operation, ensuring the green indicator LED is illuminated
•
We recommend, on commissioning the installation, a minimum charge period of 24 hours before
carrying out an emergency duration test
SENSOR DIP SWITCH LAYOUT
DIP SWITCH SETTINGS
•
Please see DIP switch layout to set up the sensor
•
Replace the diffuser ensuring seal is in place
•
Switch on and check for correct operation
SENSOR DIP SWITCH LAYOUT
DIP SWITCH SETTINGS
SENSOR DIP SWITCH LAYOUT
DIP SWITCH SETTINGS