background image

INSTALLATION 

• Provide power to the required point of installation
•  Cut a suitable hole in the ceiling as per the cut-out details (see Fig. 1) ensuring not to 

infringe with any joists, gas / water pipes or electrical cables

• Attach the connector mounting arm by slotting into either one of the spring clips on the 
  fitting
•  Remove the cable clamp on the terminal block then remove the terminal cover by 

unscrewing the red screw on the top to access the terminal block

•  Connect the luminaire to the mains supply ensuring that correct polarity is observed (see 

Fig. 2): L - Live (brown), E - Earth (green/yellow), N - Neutral (blue)

Fig.1

Fig.2

Part code

Cut-out size

RDSHxxx

64mm

 

These instructions should be read carefully and retained after installation by the end user for future 

reference and maintenance. 

These instructions should be used to aid installation of the following products: 

RD1, RD2 & RDSH 
SAFETY 

 

This product must be installed in accordance with the latest edition of the IEE Wiring 

Regulations (BS7671) and current Building Regulations. If in any doubt, consult a qualified 

electrician 

 

Please isolate mains prior to installation or maintenance 

 

Check the total load on the circuit (including when this luminaire is fitted) does not exceed 
the rating of the circuit cable, fuse or circuit breaker 

 

Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for 

installation 

 

This product is Class I and must be earthed 

 

RD1 & RD2 are IP20 rated, RDSH is IP65 rated 

 

INSTALLATION 

 

Provide power to the required point of installation 

 

Cut a suitable hole in the ceiling as per the cut-out details below ensuring that it does not 

infringe with electrical cables, water/gas pipes or ceiling joists 

Part code 

Cut-out size 

RD1 

70mm 

RD2 

80mm 

RDSH 

64mm 

 

 

Attach the connector mounting arm by slotting into either one of the spring clips on the 

fitting 

 

Unscrew the cable clamp on the terminal block then remove the terminal cover by 

unscrewing the red screw on the top to access the terminal block 

 

Connect the pre-wired terminal block to the mains supply ensuring correct polarity is 
observed  

 

Brown – LIVE, Blue – NEUTRAL, Green/Yellow – EARTH (see Fig. 1) 

Fig. 1 

Reviews: