•    Connect the luminaire to the mains supply via a suitable junction box (not included) ensuring the correct 

  polarity is observed: L - Live (brown), N - Neutral (blue) 

•    Connect the battery via the plug and socket to the inverter 
•    Place the battery and inverter into the ceiling void ensuring that there is at least 50mm 

  of clearance above and around them 

•    Lift both of the spring clips on the sides of the luminaire and push into the ceiling 
•    Switch on and check for correct operation, ensuring the green indicator LED is illuminated 
•    We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying 

  out an emergency duration test

•    If the batteries have been left in a discharged state for an extended period, we recommend that one or 

  more charge and discharge cycles are completed which should help to restore the battery capacity