![MK Diamond Products MK-100 JCS Owner'S Manual & Operating Instructions Download Page 38](http://html1.mh-extra.com/html/mk-diamond-products/mk-100-jcs/mk-100-jcs_owners-manual-and-operating-instructions_1813112038.webp)
MK-100 JCS Tile Saw Revision 06/05, Effective Date June 27, 2005
MAINTENANCE AND TROUBLESHOOTING
NOTE: “Rodding” cooling channels is performed by inserting a small wire rod through the cooling inlet on top
of the Blade Guard and directing the rod out through each of the cooling flow tubes located on the
underside o the Blade Guard. The cooling channels should be “rodded” until all ports are free of
foreign debris.
(J)
Remove the Cooling Channel
cover screws
(K)
Rod Cooling Channels
and recheck flow
Return to
MK Diamond
for Repair
(L)
Return to MK Diamond
Cover
screws
Turn counter-
Clockwise
to loosen
Allan Wrench
Rod
Channels
If cooling channels
clear, go to Step L
Go to
Step K