![Mitsubishi MELFA RV-2SD Series Standard Specifications Manual Download Page 87](http://html1.mh-extra.com/html/mitsubishi/melfa-rv-2sd-series/melfa-rv-2sd-series_standard-specifications-manual_1809737087.webp)
3 Controller
Parallel I/O unit
3-78
■ Installation method
The expansion parallel input/output unit is installed outside of the controller. Connect with the network
connection cable (NETcable-1) from the RIO connector in the rear/into of the controller.(Terminator is connected
at the time of shipment)
Fig.3-27 : Installing the parallel I/O unit (CR1DA-700 series)
6 0
5 4
6
放熱
、配
線余裕
150
6
156
2 - M 5 ネ ジ
6
168
放熱
余裕
1 2 8
(1 7 5 )
10
0
天
配 線 余 裕
(4 0 )
地
< 2 A - R Z 3 6 1 >
制 御 盤 取 付 寸 法
2 A - R Z 3 6 1 の 取 付 寸 法
6
<CR1DA-700 series>
RIOコネクタ
コントローラ背面
Controller rear
upside
downside
Wiring space
He
at
radi
ation
spa
ce
Ra
di
ation/
wiring spac
e
2-M5 screw
Control panel installation dimensions
Installation dimensions of 2A-RZ361/371 (The controller outside installation)
* The figure is standard specification.
(CE marking specification is the same.)
Summary of Contents for MELFA RV-2SD Series
Page 2: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......