8. Turning on the power
Make sure that the remote controller is properly installed according to the instructions in the Installation Manual and that the Lossnay unit
installation has been completed before turning on the power.
(1) When the power is turned on, the following screen will appear.
(2) Main display
After the successful startup, the Main display will appear.
(3) Main menu
Press the MENU button, this screen appear.
(4) Commissioning menu
You can use Commissioning menu.
Main display
(While the unit is not in operation)
Press the
,
button to move the cursor.
Press the
button to go to the next screen.
Press the
,
,
,
button to move the
cursor or page.
Press the
button to go to the next screen.
• Administrator password is required. See 9. (5) Administrator password.
Main display
(While the unit is in operation)
Note:
• Only the first time, the «Language selection» screen will be appeared.
• The product will not start-up without language selection.
• See 9. (6) Language selection.
Lossnay
Outdoor
2
°C
Return
2
°C
Fan
Mode
Auto
Lossnay
12:
Sun
12:
Sun
Main
Main display:
Cursor
Main menu
User options
Commissioning
Maintenance
Commissioning menu 1/2
Initial setting
Airflow
Auto bypass
External input
Service
Cursor
Page
Main menu:
Commissioning menu 2/2
Restriction
Error information
Error history
Run time
Maintenance interval
Cursor
Page
Main menu:
Note:
• When connecting two remote controllers, be
sure to designate one as a main and the other
as a sub controller. Refer to section 9 “Initial
setting menu” for how to make the Main/Sub
setting.
• Refer to the Instructions Book for the icons on
the display.
Normal start up (indicating the
percentage of process completion)
Please Wait
1
%
Eng-10