OPERATING PROCEDURE
PHOTOS
69
12. Removing the compressor (MC)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3)
Remove 2 front cover panel fixing screws (5 × 12) and
remove the front cover panel. (See Photo 2-1)
(4)
Remove 2 back cover panel fixing screws (5 × 12) and
remove the back cover panel.
(5) Remove the electrical parts box. (See Photo 3)
(6)
Remove 3 valve bed fixing screws (4 × 10) and 4 ball valve
and stop valve fixing screws (5 × 16) and then remove the
valve bed.
(7)
Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit then remove the right side panel.
(8)
Remove 3 separator fixing screws (4 × 10) and remove the
separator.
(9) Recover refrigerant.
(10)
Remove the 3 points of the compressor fixing nut using a
spanner or a adjustable wrench.
(11)
Remove the welded pipe of compressor inlet and outlet
then remove the compressor.
Note: Recover refrigerant without spreading it in the air.
13. Removing the power receiver
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3)
Remove 2 front cover panel fixing screws (5 × 12) and
remove the front cover panel. (See Photo 2-1)
(4)
Remove 2 back cover panel fixing screws (5 × 12) and
remove the back cover panel.
(5) Remove the electrical parts box. (See Photo 3)
(6)
Remove 3 valve bed fixing screws (4 × 10) and 4 ball valve
and stop valve fixing screws (5 × 16) then remove the valve
bed.
(7)
Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit then remove the right side panel.
(8) Recover refrigerant.
(9) Remove 4 welded pipes of power receiver inlet and outlet.
(10) Remove 2 receiver leg fixing screws (4 × 10).
(See Photo 11)
Note: Recover refrigerant without spreading it in the air.
Photo 11
Receiver leg
fixing screws
Power receiver
Receiver leg
Inlet
Outlet
Photo 12
Power
receiver
Compressor
Valve bed
Separator
fixing screw
Separator
Compressor
fixing nut
Valve bed
fixing
screws
Valve bed
fixing screw
Compressor
fixing nut
OCH533A