• Do not unpack indoor units until they have been transported to the installation site.
• Use a forklift to transport the units.
• Install anchor bolts (locally procured).
Anchor bolt size
P250, P500, P300-F, P600-F : ø8 (M8 screw)
P750, P900-F : ø10 (M10 screw)
• Be sure to install indoor units on a level surface. Since the center of gravity of the unit is in the middle of
the unit, if the units are tilted they may fall.
Caution when connecting a duct
• Install a canvas duct between the unit and the duct.
• Use non-flammable parts for the duct.
• Provide sufficient heat/sound insulation to ducts and flanges.
• Avoid using ducts made of flexible aluminum or similar lightweight materials. They may vibrate and
produce noise.
(1) Installation
71
(3) Installing the Indoor Unit
CAUTION
Properly dispose of packing materials.
• Pallets and the nails on the pallets can pose the risk of injury.
• Plastic bags can pose suffocation and choking hazards: keep out of the reach of children. Tear the
plastics bags before disposing of them.
CAUTION
Exercise caution when transporting units.
• Products weighing 20 kg[45 lbs] or more should not be carried by one person.
• Do not carry the product by the PP bands that are used on some packages.
• To reduce the risk of cuts, keep your hands away from the heat exchanger fins.
• When using a crane or other hoisting equipment to lift a unit, always suspend the unit from four corners.
WARNING
Install the unit on a level surface.
• If the unit is installed on an incline, water leakage or malfunctions may result. Check for straightness
with a level.
WARNING
Do not stand on the unit.
• You may fall down or the item may fall, causing injury.
Summary of Contents for PUHY-P250YHM-A
Page 1: ...Model PUHY P Y S HM A PFAV P VM E F DATA BOOK AIR CONDITIONING SYSTEMS ...
Page 92: ...90 ...
Page 93: ...91 L2 L31 L4 L32 200m 656ft ...
Page 95: ...93 3 Emergency Operation Mode ...
Page 96: ...94 ...
Page 98: ...96 ...
Page 99: ...97 ...