73
OCH756
OPERATING PROCEDURE
PHOTOS/ FIGURES
6. Disassembling the electrical parts box
(SHWM140V model only)
(1) Remove the electrical parts box. (See Photo 3-1)
(2) Disconnect all the connectors on the controller circuit board.
(3) To remove the controller circuit board, release it from the support.
(4) Remove the cont base front fixing screws (3 for front/ 4
×10) to remove the cont base front. (The cont base front is
fixed to the electrical parts box with a hook on the left side.)
(5) Disconnect all the connectors on the noise filter circuit
board. (Remove the lead wire fixing bolts (4 for front/ 6 ×
12) on board.)
(6) To remove the noise filter circuit board, release it from
the support.
(7) Remove the cont base fixing screws (3 for front/ 4 × 10)
to remove the cont base. (The cont base is fixed to the
electrical parts box with a hook on the left side.)
(8) Disconnect all the connectors on the power circuit board.
(Remove the lead wire fixing bolts (2 for front/ 6 × 12) on board.)
(9) Remove the PB fixture fixing screws (4 for front/ 3 ×12)
to remove the PB fixture.
(10) To remove the power circuit board, remove the power cir-
cuit board fixing screws (4 for front/ 3 x 12 and 2 for front/
4 x 12), then release the board from the PB holder.
(11) Remove the reactor (DCL1, DCL2, DCL3) fixing screws (6
for rear/ 4 × 10) to remove the reactor, then disconnect
the connectors on reactor.
(12) Remove the thermistor <Heat sink> (TH8) fixing screw (1
for front/ 3 × 8) to remove the thermistor <Heat sink> (TH8).
(13) To remove the heat sink, remove the heat sink fixing
screws (4 for front/ 4 ×10), then release the heat sink
from the PB holder.
Note 1: When reassembling the electrical parts box, make
sure the wirings are correct.
Photo 6-1
Photo 6-2
Photo 6-3
Photo 6-4
Photo 6-5
7. Removing the thermistor <2-Phase Pipe> (TH6)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Disconnect the connector TH7/6 (RD) on the controller
circuit board in the electrical parts box. (See Photo 3-1)
(4) Loosen the fasteners and wire clips for the lead wire in
the electrical parts box.
(5) Loosen the clamp for the lead wire on the rear of electri-
cal parts box.
(6) Pull out the thermistor <2-phase pipe> (TH6) from ther-
mistor clip.
Note 1: When replacing thermistor <2-phase pipe> (TH6),
replace it together with thermistor <Ambient>
(TH7) since they are combined together.
Refer to procedure No.8 to remove the thermistor
<Ambient> (TH7).
Photo 7
8. Removing the thermistor <Ambient> (TH7)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Disconnect the connector TH7/6 (RD) on the controller
circuit board in the electrical parts box. (See Photo 3-1)
(4) Loosen the fasteners and wire clips for the lead wire in
the electrical parts box.
(5) Loosen the clamps for the lead wire on rear of electrical
parts box.
(6) Remove the sensor holder fixing screw (1 for rear/ 5 ×
12) to remove the sensor holder.
(7) Pull out the thermistor <Ambient> (TH7) from sensor holder.
Note 1: When replacing thermistor <Ambient> (TH7),
replace it together with thermistor <2-phase pipe>
(TH6), since they are combined together.
Refer to procedure No.7 to remove the thermistor
<2-phase pipe>(TH6).
Photo 8
Thermistor
<2-Phase Pipe>
(TH6)
Thermistor <Ambient> (TH7) and sensor holder
Cont base front
Controller circuit board
Power circuit board
Reactor
Noise filter circuit board
Cont base
Thermistor <Heat sink> (TH8)
Heat sink
PB fixture
PB holder