2. Installation procedure 【Applicable model : Group D】
Install the M-NET board ① so that the
(SW11, SW12) come front.
※Put it securely until it sounds click.
Install the Terminal block (M-NET) ⑥ on
the base of the electric box.
Put the Label ⑧ on the base of the
electric box.
Connect the lead wire-B ⑩ to both the
connector CN5 on the M-NET board ①
and the connector CNMNT on the
control board.
※Caution
Wire Marking:NON-INV, Connector
color:White Always make sure that the
markings and the applicable model match.
If used incorrectly, parts could be
damaged.
Connect the lead wire-C ⑪ to both the
connector CND on the M-NET board ①
and the connector CNVMNT on the
control board.
Connect the lead wire-D ⑫ to both the
connector CN2M on the M-NET board
① and the terminals A & B on the
terminal block (M-NET) ⑥.
The lead wires should be tied together
with the other lead wires with
the pull tight ⑭ not to loose.
Wiring length is adjusted according to
apparatus.
It progresses to the
xx
page
3.Wiring method for M-NET
Note1:Use ground wire and screw ⑬ as
required to connect the shield of
M-NET transmission line to the unit.
Note2:Take great care that no lead wire is
caught on anything when instaling
panels.
1
2
3
6
4
5
1
2
3
4
5
6
7
Hole for M-NET ground
Position hole
Terminal
block
Terminal
block
①M-NET board
Control board
⑧Label
⑥Terminal block (M-NET)
⑦Screw (M3×20)
Mounting hole
A
B
S
Address switches
SW12 SW11
Control board
Terminal
block
Terminal
block
Connection of
M-NET board (CN5)
and Control board
(CNMNT)
Connection of
M-NET board (CND)
and Control board
(CNVMNT)
Connection of
M-NET board (CN2M)
and Terminal block
(Terminals A & B)
⑩Lead wire-B
⑫Lead wire-D
①M-NET board
CND
CN2M
CN5
⑪Lead wire-C
A
B
S
CNVMNT
CNMNT
M-NET Converter
PAC-SF81MA-E