6
GB
4 Wiring
4-1. Wiring procedure
1.
Remove the screws used to secure the cover, and then open the cover.
2.
Connect the power supply and transmission wiring. (Refer to 4-2 and 4-3.)
3.
After connection for the each cable, fasten the each cable with the cable fixture.
4.
After finishing the wiring, be sure to secure the cover with the screws before turning on the power source.
4-2. Power Line
Wire the power cable and protective earth cable (grounding cable) to L/L1, N/L2 and the earth line (grounding line) terminals on the TB1 as shown in
the Fig.4-3.
WARNING:
• All electric work must be performed according to local regulations.
Improper electrical work may result in electric shock or fire.
• Be sure to shut off the power source of the unit and the all other unit to be connected to the Transmission Booster before wiring.
• Firmly secure the wiring so that it does not become disconnected.
CAUTION:
• Do not connect the AC power line to the M-NET and POWER (30 VDC) terminal blocks of this device to prevent unit failure.
UP
Remove the screws
TB3 M-NET Transmission
terminal block 2
(receiving electrical power from
the unit)
Power line terminal
TB1
Remove the screws
TB2
M-NET Transmission terminal block 1
(receiving electrical power from another unit)
Fig.4-1
Fig.4-2
EU: ~220 V - 240 V 50 Hz
US: ~208 V - 230 V 60 Hz
Power source
Circuit breaker
Power cable
* EU shows L/N and the
US shows L1/L2
Protective
earth cable
(Grounding cable)
Power cable
Ground
Protective earth cable
(Grounding cable)
PAC-SF46EPA
Fig.4-3
00_WT08989X01.book 6 ページ 2018年11月12日 月曜日 午後4時7分