105
105
OPERATING PROCEDURE
PHOTOS
6. Removing the reactor
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, cabinet, back panel, and the
electrical parts (Photo 1, 2, 3, 4).
(3) Disconnect the reactor lead wire from the terminal of the
reactor.
(4) Remove the screws of the reactor, and remove the reactor
(Photo 9).
Photo 9
Screws of the reactor
4. Removing the 4-way valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(3) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure gauge
shows
PSIG.
(4) Remove the electrical parts (Photo 4).
(5) Detach the welded parts of 4-way valve and pipe (Photo 7).
5. Removing the expansion valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the electrical parts for removing LEV E (Photo 4, 5).
(4) Remove the LEV coils.
(5) Detach the welded parts of expansion valves and pipes.
4 way valve
R.V. coil
Expansion
valves
Photo 7
Photo 8
LEV coils
Welded parts
Summary of Contents for MXZ-2A20NA - 1
Page 52: ...52 WIRING DIAGRAM 7 MXZ 2A20NA ...
Page 53: ...53 MXZ 2A20NA 1 ...
Page 54: ...54 MXZ 2A20NA 2 ...
Page 55: ...55 MXZ 3A30NA ...
Page 56: ...56 MXZ 3A30NA 1 ...
Page 57: ...57 MXZ 4A36NA ...
Page 137: ...137 ...