14
Refrigerant Piping
Max. length
A
Max. Height
difference
B
Indoor
unit
Outdoor unit
MAX. REFRIGERANT PIPING LENGTH and MAX. HEIGHT DIFFERENCE
Refrigerant piping : m
Max. length
A
Max. Height
difference
B
15
30
Gas
12.7
15.88
Liquid
6.35
9.52
MUZ-GA50VA
MUZ-GA60VA
MUZ-GA71VA
Model
Piping size O.D : mm
Model
MUZ-GA50VA
MUZ-GA60VA
Refrigerant piping length (one way)
Outdoor unit
precharged
1,800
15m
160
20m
260
25m
360
30m
460
7m
0
10m
60
ADDITIONAL REFRIGERANT CHARGE (R410A: g)
Calculation: Xg = 20 g/m x (Refrigerant piping length (m) -7)
Outdoor unit
precharged
2,000
0
165
440
715
990
1,265
Refrigerant piping length (one way)
15m
10m
7m
Model
MUZ-GA71VA
20m
25m
30m
Calculation: Xg = 55 g/m x (Refrigerant piping length (m) -7)
NOTE:
Refrigerant piping exceeding 7m requires additional refrigerant charge according to the calculation.
Summary of Contents for MUZ-GA50VA-E1
Page 10: ...10 MUZ GA60VA E3 ...